My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL39100
DRMS
>
Back File Migration
>
General Documents
>
GENERAL39100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:58:38 PM
Creation date
11/23/2007 10:00:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
General Documents
Doc Date
5/20/1988
Doc Name
Letter & Revised As-built & Construction Certs for Haul Road 2 & 3
From
PEABODY COAL CO
To
MLRD
Permit Index Doc Type
ROADS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Summary - Area No. 2 Haul Road. In accordance with Rule 4, Part 4.03.1(1)(d) <br />of the Rules and Regulations of the Colorado Mined Land Reclamation Board pursuant to the <br />Colorado Surface Coal Mining Reclamation Act 34-33-101 et. seq., I, James Gary Schlenvogt, <br />hereby certify that the construction of Area No. 2 Haul Road was inspected by myself. I, <br />James Gary Schlenvogt, am a 1975 graduate in civil engineering and I have been a <br />Registered Professional Engineer in Colorado since October 17, 1980. From August 17 until <br />August 25, 1987, I was on site and inspected this structure. <br />The Area No. 2 Haul Road is the main haul road out of the Area No. 2 mine area. This <br />certification covers approximately 220 feet of the haul road. This haul road was utilized <br />in the 1970s and early 19BOs for access to the Area No. 2 mine area and was closed in 1983 <br />when the mine went into temporary closure. The road was reopened again in 1987 when <br />mining began in this area. The only construction occurred when the topsoil was removed <br />and the road was cut basically on grade in order to minimize disturbance. <br />The purpose of my inspection and certification was to ensure proper construction of Area <br />No. 2 Haul Road and to satisfy the requirements of Rule 4.03.1(1)(d) of the Colorado Mined <br />Land Reclamation Division. <br />~~ To the best of my knowledge, based upon my professional expertise and to the extent <br />possible, this haul road at the Nucla Mine was constructed in accordance with the prudent <br />sta te-of -the-art of earthen construction. Further, the structure was constructed in <br />compliance with the approved design, to the extent possible, as specified in Tab 13 of <br />Peabody Coal Company's mine permit. Sediment and runoff control is provided by <br />Sedimentation Pond 006. The haul road location and horizontal alignment is shown on <br />Exhibit 12-2, Operations Plan. The vertical alignment is shown on the "Area No. 2 Haul <br />Road - As-Built". The road width is adequate for the anticipated low volume of traffic in <br />this mine area. <br />The road was constructed on grade after topsoil was removed; therefore, no density tests <br />or proctors were required; however, the road appears to be adequately maintained by the <br />mine's motor grader and the road appears to be compacted from the routing of heavy <br />construction equipment and coal haulage over the road. The road is constructed in the <br />same location as the road used by the mine in the 1970s and 1980s. The road structure <br />appears to be stable, evidencing no indications of cracks, deep rutting, settlement, or <br />slope instability. Side cut slopes are insignificant and cut slopes stability is not a <br />
The URL can be used to link to this page
Your browser does not support the video tag.