Laserfiche WebLink
Items Approved for Permanent Retention <br />Items previously approved as permanent are shown in Table 1, below. <br />Table 1-Items approved as permanent <br /> Permitting <br /> action Approval date <br />Permanent item <br /> approving <br /> retention <br />Pond TR-13 11/27/02 <br />Building next to pond MR-13 12/11/95 <br />Road leading to building MR-13 12/11/95 <br />Part of a pre-law high- TR-6 7/28/95 <br />wall <br />Previous Bond Releases <br />Information on Sunland's previous bond release application is summarized below. <br />Table 2 -Previous bond release application <br />Bond <br />release Approval Decision phase Area <br />application status date <br />no. <br /> All disturbed azeas, <br /> except the pond, east <br />SL-1 Approved 1/29/96 I yard drainage <br /> control berm, and <br /> road to the buildin <br />Apex No. 2 Mine Page 3 January 24, 2003 <br />Phases 1, II, and III Bond Release <br />