Laserfiche WebLink
MCC/Schmidt <br />December 1, 2005 <br />Page 2 of 2 <br />product that reported to the surface stream on November 12, 2005 (no later than <br />December 6, 2005); <br />5.) Provide the water sampling results obtained as specified in Number 4 above (no <br />later than December 9, 2005); and, <br />6.) Continue to ensure that all materials used in support of the MCC operation remain <br />secure and properly contained. <br />Please be advised that enforcement procedures may be implemented if additional <br />evidence or review indicates that such action is necessary. <br />Thank you for your cooperation in this matter. Please contact me with any questions. <br />Sinc ely, <br />id Berry <br />Manager, Coal Program <br />CC: Ronald W. Cattany, DMG Director <br />Cheryl Linden, AGO <br />Jim Fulton, OSM <br />Dave Akers, CDPHE <br />Dan Hernandez, DMG <br />Tom Kaldenbach, DMG <br />