Laserfiche WebLink
<br />Stipulation No. 18 <br />Prior to initiation of conswction of Haul Road "G," the permittee will submit the <br />landowner request for haul road retention as required by Rule 4.03.1(i)(f)(II), or will <br />otherwise modify the reclamation plan to comply with Rule 4.03.1(1)(f). <br />Status.• Resolved, 5/21/92 <br />Stipulation No. 19 <br />The operator shall submit to the Division a report describing the fmdings of test pits in road <br />cut areas identified as possible stability problems, indicating whether projections from <br />geologic mapping of the area were accurate. The operator shall also submit to the Division <br />a slope stability monitoring plan for the road cut areas identified by the operator's consultant <br />as possible stability problems. This plan shall be approved by the Division and installed <br />prior to conswction of the road. <br />Status: Resolved 6/4/92 <br />Seneca II-W Mine <br />Page 7 <br />