Laserfiche WebLink
<br />iii iiiiiiiiiiiu iii <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Duparlmem ni Namrol Resources <br />131 ; Shrrman 51., Room ' l i <br />Donver, ColuraJu :10'03 <br />Phunr: 17051 H66-}567 <br />r:~x.170:1 zn-a i D6 <br />DATE: June 7, 1999 <br />TO: All Bidders on the Trinidad Basin Mine Project <br />~~ /1 <br />FROM: Gary Curtiss, Division of Minerals and Geology (~~,~Il/ <br />RE: Amendment No. 2 to PKA-9-440 <br />O I v 15 1 0 N O F <br />h11NERALS <br />GEOLOGY <br />RECLAMATION <br />MININ G'SAFETY <br />tllll O..ens <br />Gmernnr <br />Creg E. Watcher <br />E.ecwive Dbenor <br />Michael 8. Lanq <br />Dw~sinn Director <br />Thank you for your interest in the Pre-Bid Meeting. The following clarifications and amendments <br />should be noted and incorporated into the bid documents: <br />Task 2, Removal of Pond 15-P1 -The embankment material may be placed to the north, <br />northwest and northeast to achieve a uniform slope. Material may be placed in low spots in <br />the weed covered area to the northeast to achieve a uniform grade. Portions of the weed <br />infested area filled with at least 2 feet of pond embankment material will not need to be <br />sprayed as required in Task 14. <br />2. Task 4 -The overall width of the channel cross-section, including the side slopes is 24 feet, <br />not 30 feet as shown on Drawing 2 of the original bid document. The check dam footprint has <br />been changed slightly. Enclosed are Figures 1 A and 2A to clarify the channel and check dam <br />construction. The crest and key of each check dam will now be curved in an upstream <br />direction (See figure 1A). Disregard the reference to geotextile placement in Drawing 2 of the <br />original bid document. The geotextile is shown on Figure 2A enclosed. <br />The original bid document discusses armoring the area where the new channel meets the <br />culvert at the county road and references Drawing 4. Some changes have been made to the <br />armoring requirements, therefore, disregard the reference to Drawing 4 and refer instead to <br />Figure 3A, enclosed. The road embankment around the culvert on both sides of the road will <br />be armored with a grouted rock wall. The wall will be at least 12 inches thick and will be <br />constructed of durable rip-rap having a minimum D-50 of 9 inches and a D maximum of 18 <br />inches. At least the outer 4 inches of the rock wall will be cement-grouted with a <br />commercially available sand and cement mix with a minimum compressive strength of 3,500 <br />psi at 28 days. <br />3. Task 6 -Please delete the Culvert Maintenance portion of the task. This is no longer <br />required. <br />4. Task 7 -The single fence rock check dam will not be constructed at the drainage crossing <br />near the crest of the access road. Instead, the gully below the road will be backfilled with on <br />site material to the approximate original embankment contours. Material will be backfilled in <br />the deep gully which has a slope length of approximately 37 feet and in the shallow gully <br />below which has an approximate slope length of 20 feet below the deep cut. Backfill will end <br />at the point at which the slope of the gully begins to level out. This is near the pinon tree <br />