My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL38956
DRMS
>
Back File Migration
>
General Documents
>
GENERAL38956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:58:32 PM
Creation date
11/23/2007 9:55:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
General Documents
Doc Date
6/27/1984
Doc Name
PROPOSED DECISION And FINDINGS OF COMPLIANCE
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- <br />Stipulation No. 10 <br />THE DIVISION DIRECTS DORCHESTER COAL COMPANY TO MONITOR THE LOCATION AND <br />ORIENTATION OF THE THOMPSON RANCH STRUCTURES. THE APPLICANT SHALL <br />SURVEY THESE STRUCTURES ON A QUARTERLY BASIS. <br />Stipulation No. 11 <br />THE DIVISION DIRECTS DORCHESTER COAL COMPANY TO SUBMIT A PROPOSED REPORT <br />FORMAT FOR THE REQUIRED SEMI-ANNUAL SUBSIDENCE MONITORING REPORT, WITHIN <br />120 DAYS FOLLOWING PERMIT APPROVAL. THIS REPORT FORMAT SHALL INCLUDE <br />TABULATED SURVEY MONUMENT AND STRUCTURE LOCATION AND ORIENTATION DATA. <br />SURVEY DATA FOR THE TWO HIGH-RESOLUTION MONUMENT GRIDS SHALL ALSO BE <br />PRESENTED GRAPHICALLY, IN CROSS-SECTION FORM. THE SUBSIDENCE MONITORING <br />MAP SHALL BE AMENDED TO INCLUDE MONUMENT IDENTIFICATION LABELING, IN <br />ORDER TO FACILITATE DATA REPORTING AND ANALYSIS. FINALLY, EACH <br />SEMI-ANNUAL SUBSIDENCE MONITORING REPORT SHALL INCLUDE A SUMMARY <br />COMPARISON OF MONITORING RESULTS AND THE APPLICANT'S PREDICTIONS FOR <br />EACH INVENTORIED STRUCTURE AND THE STREAM CHANNEL OF NEWLIN CREEK. <br />
The URL can be used to link to this page
Your browser does not support the video tag.