My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL38889
DRMS
>
Back File Migration
>
General Documents
>
GENERAL38889
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:58:30 PM
Creation date
11/23/2007 9:53:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983058
IBM Index Class Name
General Documents
Doc Date
7/14/1987
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EARTHWORK ESTIMATING - RIPPING WORK <br />TASK DESCRIPTION: ~u ~~ ~~ <br />HOURLY EQUIPMENT COST: <br />Machine make .and model ~~''L attachments: ~ ~~~ <br /> adjusted Operator Cost Per Hour <br /> hours days base base s ift total <br />shift per per rental operating wage overtime premium equip. <br />no. da week rate/hr. cost/hr rate/hr adjustment adj. cost/hr <br />1 N/A <br />z ~~ <br />3 ~~ ~~ <br />coca i = 5 J Stf ~~ <br />$ /hr. divided by shifts/day = $ average equipment cost /h r. <br />MATERIAL QUANTITIES: <br />Volume Method (bank material or rock): BCY (total to be ripped) <br />type of material se~zmic ve ocity = fps <br />Area method (compacted fills, pavement) _ /s a.e~ sq. ft. (total area) <br />ripping depth required to alleviate compaction = ~ S/ inches <br />Verification method(s) used <br />HOURLY PRODUCTION: <br />Volume method (for DRL, D9L, and D10 dozers w/single shank rippers only): <br />BCY/hr from production graphs in Sec. VII x job efficiency (avq. far <br />a shi s x altitude adj. = BCY/hr~j sted oroduction <br />Area method (for dozers, track loaders or graders w/multi-shank rippers) <br />07. sq. ft./hr (from oroduction tables in Section VII) x ,f 3 job <br />e iciency avg. for all shifts) x / altitude adj. _ ~_o u sq. ft./hr <br />JOB TIME: <br />Volume method: BCY divided by BCY/hr = hrs <br />o ma vo ume a3j: pry o J~'o6-fime <br />Area method: _~~ sq. ft. divided by 2 sq. ft/hr = 7~~~ hrs <br />total area a~J. proms o J~f-'oTi Elms <br />JOB COST: <br />7.S hrs x $ /y~.3y /hr = $ ~ /// 1 Total Job Cost <br />tot. job time avg. equip. cost <br />unit cost = $ ///~ divided by / S = S <br />total job cost total vol. or area 6 or sq.rft-- <br />_ t <br />
The URL can be used to link to this page
Your browser does not support the video tag.