My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL38889
DRMS
>
Back File Migration
>
General Documents
>
GENERAL38889
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:58:30 PM
Creation date
11/23/2007 9:53:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983058
IBM Index Class Name
General Documents
Doc Date
7/14/1987
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EARTHWORK ESTIMATING - TRUCK/LOADER TEAMS <br />TASK DESCRIPTION: ~a..,,,,~, L..,..~s ~ ~._h ~~'% <br />HOURLY EQUIPMENT COST: <br />Truck make and model <br />Loader make and mode <br />C. <br />adjusted Operator Cost Per Hour <br />hours days base base shift total <br />shift) per per rental I operating I wage I overtime I premium I equip. <br />no, day week rate/hr, cost/hr rate/hr adjustment ad.i. cost/h <br />2 <br />3 ~ ~ <br /> tots truc cost r. _ /p~ , y J <br />.- total loader cost/h r. = E x.20. i~ <br />S /hr. divided by shifts/day = E average truck cost/hr. <br />E /hr, divided by shifts/day = E average loader cost/h r. <br />MATERIAL QUANTITIES: <br />Sank volume = BCY x swell factor = 8$ D o LCY <br />Verification met od s used <br />HOURLY PP.ODUCTION: <br />Haul distance = oo ft., return distance = .~e'Re ft., altitude = $"8s+ ft. <br />Total resistance au ,~ ~ rolling resT ~ "< grade res. +or- _ // <br />Total resistance (return): .2 ~ rolling re s, plus _p grade res. (+or-)= <br />Note: for grade resistance, (+) = unfavorable, favorable (downhill) <br />Truck capacity 3p .~ LCY (nominal heaped) _ . <br />Loader capacity = ~~ LCY (nominal heaped) x /,o bucket fill factor from <br />fill factor a ,lustment table in Section VII = ~~t'Y/bucket load (adj. cap'; <br />No. of loader passes required to fill truck = ~_ (round to nearest whale no.) <br />Adjust truck capacity = ,~o. t LCY <br />Loader cycle time: basic cyc a oad, maneuver and dump) = min. <br />1st pass = 0.1 min (bulk of 15t pass completed urines' g truck exchange <br />2nd ---------- . G min <br />3rd ---------- 6 min Loader cycle corrections: <br />4th ---------- 'G min = <br />5th ---------- min <br />6th ---------- min <br />_ /• ~ min total load time <br />Truck cycle time: Exchange time ---------- <br />Load ------------------- <br />Haul ------------------- <br />Maneuver at dump ------- <br />Dump ------------------- <br />Return ----------------- <br />7 min. <br />1 4 <br />,7 <br />.a <br />/. ~ <br />time <br />
The URL can be used to link to this page
Your browser does not support the video tag.