My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL38847
DRMS
>
Back File Migration
>
General Documents
>
GENERAL38847
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:58:28 PM
Creation date
11/23/2007 9:51:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981023
IBM Index Class Name
General Documents
Doc Date
5/1/1992
Doc Name
Proposed Decision & Findings of Compliance for SL1
From
Phase I
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Summary of the Review Process <br />Kaiser Steel Resources Incorporated applied for a partial bond release under <br />the Colorado Surface Coal Mining and Reclamation Act for backfilling and <br />grading work completed at the Chimney Rock Mine. The mine is located <br />approximately l7 miles southwest of Pagosa Springs, adjacent to Colorado State <br />Route 151 in portions of Section 30, Township 24 North, Range 4 West. The <br />operator requested that 60 percent of the reclamation bond for the mine be <br />released. <br />An incomplete application for the bond was received by the Division on <br />March 18, 1991. Upon receipt of additional information, proof of publication <br />of the public notice, and the proof of release notifications to interested <br />parties, the application was complete. The operator requested the release of <br />$480,000.00 of the $800,00.00 bond held for the mine. The Division scheduled <br />and conducted a bond release inspection on August B, 1991. <br />The site inspection was conducted in accordance with Rule 3.03.2(2). <br />Representatives of the Division, the Albuquerque Field Office of the Office of <br />Surface Mining, the Bureau of Land Management, the U.S. Forest Service, and <br />the Chimney Rock Mine were present. During the inspection, a few problems <br />were noted and the mine representative elected to have another site inspection <br />so that all areas could be submitted for the Phase I bond release. A second <br />site inspection was performed on November 13, 1991 after all remaining work at <br />the site was completed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.