Laserfiche WebLink
999 <br />EASTSIDE STIPULATION STATUS <br />StiP Subject Due Date 1st Sub O.K.'d <br />1 Hydro monitoring Annual submittal <br />2 Pond 2 dewatering device 02/14/85 01/30/85 04/04/85 <br />3 Mark 60% sediment levels w/in 30 days of 06/ /85 06-f--/85 <br /> pond construction ~o nu5 8'1 <br />4 Identify water loss 05/20/85 05/07/85 U//y~~i <br />5 Revise cover standards 02/14/85 01/30/85 04/04/85 <br />6 Revise seed mix 02/14/85 02/26/85 04/04/85 <br />7 Raptor poles 04/14/85 03/13/85 05/09/85 <br />8 Slope stability analy. 04/14/85 04/03/85 05/09/85 <br />9 Waste pile drainage 04/14/85 04/03/85 05/09/85 <br />10 Non-coal waste disposal 02/14/85 01/30/85 04/04/85 <br />11 Subsidence monitoring 05/20/85 01/30/85 05/20/85 <br />12 Portal sealing plan 05/14/85 04/14/85 05/09/85 <br />13 Submit reclamation fees prior to permit satis. <br />