Laserfiche WebLink
Stipulation No. 9 <br />PRIOR TO PRODUCING COAL FROM THE TWIN PINES NO. 2 MINE, TWIN PINES COAL <br />COMPANY MUST RECEIVE APPROVAL FROM THE DIVISION FOR THE RECLAh1ATI0N PLAN „~ <br />fOR THE TWIN PINES N0. 1 PORTAL AREA. THE RECLAMATION PLAN MUST COMPLY <br />WITH THE REQUIREMENTS OF RULE 2.05.4. AND MUST BE SUBMITTED WITHIN 120 <br />DAYS OF PERMIT ISSUANCE. <br />ACCEPTED AND AGREED: <br />Twin Pines Investment Limited <br />Partnership; Falcon Energy, Inc. <br />General P ner <br />Aerator Title <br />MINED LAND RECLAMATION DIVISION <br />COLORADO DEPARTMENT OF <br />NATURAL RESOURCES <br />Division Director <br />AG Alpha No. NR LR TYB <br />AG File No. PNR/3928/JD <br />