Laserfiche WebLink
i III IIIIIIIIIIIII III • - <br />999 <br />DEPARTMENT OF NATURAL RESOURCES <br />David H. Getches, Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />fiichartl D. lemur <br />Governor <br />DATE: July 24, 1984 <br />T0: Ed Bischoff <br />FROM: P.C. Saletta J , ~' <br />RE: GEC Reclamation Plan <br />On Monday, July 23, 1984, I met with Curtis Miller, consultant for GEC. As I <br />had verbally requested he submitted the following items: <br />1. West Pit cross-sections and locations. <br />2. Final reclaimed topography map for Overburden Stockpile No. 1. <br />3. A letter stating that the drainage system would be maintained as <br />necessary to assure drainage to the existing sediment ponds. <br />4. Locations of East Pit cross-sections. <br />The following items were also discussed concerning the reclamation plan: <br />1. Grading down of highwalls in Verdos Alluvium into the backfilled East <br />Pit. <br />2. Channel gradient through the backfilled East Pit. <br />3. Yardage volumes and cross-sections based on the above changes required <br />for reclamation in the East Pit. <br />4. Submit a plan which further discusses reclamation in the Tipple Area, <br />Orphan Pit, North Orphan Pit and the Refuse Pit. <br />5. Changes in reclamation time frame. <br />The above items, which are primarily technical concerns regarding the <br />reclamation plan submitted on July 18, 1984, will be submitted on or before <br />August 9, 1984. <br />In general, Mr. Miller has responded in a timely manner and has expressed <br />verbal agreement with the concerns needed to be resolved for preparing an <br />approved final reclamation plan. <br />/ep - <br />Doc. No. 3007 <br />cc: P1r•. Curtis Mi 11 er <br />Mr. Steve Layton <br />423 Centefinial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />