Laserfiche WebLink
FS-2800-5 (755) <br />VI. FOREST SERVICE EVALUATION OF PLAN OF OPERATIONS <br />A. Required changes/modificationsJspecial mitigation for plan of operations: <br />Reclamation of all disturbances connected with this plan of operations is covered by Reclamation <br />Performance Bond No. 124247319, dated September 21. 2001, signed by Jerry Hermans. Castle <br />Concrete. Inc. (Principal) and Adrienne C. Stevenson. Continetal Casualty Comoanv jSuretvl, for the <br />penal sum of 5995.300.00. This Reclamation Performance Bond is a guarantee of faitMul performance <br />wRh the terms and conditions listed below, and with the reclamation requirements agreed upon in the plan <br />of operations. This Reclamation Performance Bond also extends to and includes any unauthorized <br />activities conducted in connection with this operation. <br />The bond amount for this Reclamation Performance Bond was based on a bond calculation worksheet. <br />The bond amount may be adjusted during the term of this proposed plan of operations in response to <br />changes in the operations or to changes in the economy. Both the Reclamation Performance Bond and <br />the bond calculation worksheet are attached to and made part of this plan of operations. <br />Acceptable bond securities (subject to change) include: <br />1. Negotiable Treasury bills and notes which are uncondRionally guaranteed as to both principle and <br />interest in an amount equal at their par value to the penal sum of the bond; or <br />2. Cert'rfied or cashier's check, bank draft, Post Office money order, cash, assigned certificate of deposit, <br />assigned savings account, blanket bond, or an irrevocable letter of credR equal to the penal sum of <br />the bond. <br />(If mnrr rpacr it herded to fiR out a block of inJormacon, we addiliand rhern atd attach form <br />-9- <br />