My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL38678
DRMS
>
Back File Migration
>
General Documents
>
GENERAL38678
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:58:21 PM
Creation date
11/23/2007 9:47:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
General Documents
Doc Date
12/10/2001
From
JERRY HERMANS
To
LARRY OEHLER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fs-zeoas 1~9s> <br />OMB NO. 0596-0022 (E:pits 1/d1iD2) <br />C. Project Description. <br />Describe all aspects of the operation including mining, milling, and exploration methods, materials, equipment, <br />worMorce, construction and operation schedule, power requirements, how clearing will be accomplished, topsoi <br />stockpile, waste rock placement, tailings disposal, proposed number of drillholes and depth, depth of proposer <br />suction dredging, and how gravels will be replaced, etc. Calculate production rates of ore. Include justificatio <br />and calculations for settling pond capacities, and the size oT runoff diversion channels. <br />Exhibit C: Is cited material from the Environmental Assessment which rovides a tom rehensive <br />escri lion of the enhanced reclamation ro'ect. <br />he enhanced reclamation of Pikeview guar encom sses 210 acres of rivate land and u to 2 acres of <br />ational Forest land. The reclamation activities over the next 12 ears will la back the terrain of the National <br />Forest lands. <br />astle Concrete will utiliz their staff and ui ment o raters in artnershi wRh volunteers and techni i al <br />u rt from Colorado Mountain Reclamation Foundation. The ro'ect work is scheduled in a ear round <br />aration with minin and reclamation bein timed concurrent) . <br />Timetables For Mining end Reclamation Operetions <br />Phase Year Mining in Area Mined Acres Reclamation in Area <br />1 1-2 West 13.26 ----•--------- <br />2-4 West & Current On-going West & Current <br />5-12 Current N/A Current <br />Phase 1 -Pre roduetion and Site Pre aration: <br />Pre- reduction site re aration activities are esi n rimaril to secure the site boundaries rovide access for <br />minin salva a and slot a of to soil and to im lament drains a im rovements. This hase of the ro osed <br />coon would involve the followin ste s. <br />1. Surve of the land ownershi boundaries the ro sad cliff slo ed hi h-wall locations and the bounds of th <br />isturbance area would be field marked. <br />. Construction of tam ra access roads with bulldozers. <br />. Tree Harvest and To Soil Salva e. <br />.Benches would be develo ed on both the north and central rid es throw h drillin and blastin o aration. Fill <br />materials will be used initial) to construct haul roads after lacement of ulverts. <br />. After the hi hest cliffs are constructed b re-s lit drillin and blastin the ranite in the rid es at the western <br />e of the minin area benchin and slo a backfillin would be in on the slo a below. Slo es w ukf be no <br />tee er than 2:1. <br />. The lacement of to soil donated b the commun' and slot fled a the ua for use in reclamation on <br />rivate land would be laced after the tom )aliens of each 30-40 vertical feet of slo e. No tar a amounts of <br />onated to soil will be used on National Fore t S stem land. Sm II uanitRies of donated to soil with similar <br />haracteristics and materials as the existin to soil can be used as soil su lamentation on NFS land. Castle <br />oncrete will make efforts to screen th donated to soil to tom I wRh Forest Service r uirements. <br />. The se wants resented in ste 5 and 6 would occur glen the entire western slo a of the a nded uar <br />Phase 2 -Production 8 Reclamation: <br />inin o erations under hase 2 include both federal lands and the alread ermitted areas. First limestone antl <br />ranite from the lower art of the National Forest land would be hauled for rocessin and for fillip An estimated <br />600 000 tons of material would be used as backfill in the mined areas and about 1 900 OOO tons of material <br />limestone and decom sad ranite would be sold as road base. Under a Mineral Material Contract with the U.S. <br />Forest Service Catsle Concrete could tential urchase 200 000 cubic ards of fill material in a twelve month <br />stied. <br />Phase 3: <br />his hase includes both minin and reclamation o erations in the current) ermitted rivate land minin area. <br />Ise it includes the removal of rocessin and maintenance facilities for the existin uar nd final reclamation <br />f slopes according to the 1994 base and enhanced reclamation plans. <br />(/f more spnrr is needed w fiU our a Klock of informadan, use addiaowl sheetr arul swath form) <br />3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.