Laserfiche WebLink
Ivfinor Revisions: (continued) <br />MR-161 4127/98 Derringer pit dragline assembly tub <br />Technical Revisions: <br />Revision No. Approval date Nature of revision <br />TR-63 7/13/93 1992 Annual Report <br />TR-64 5109/94 Annual Report <br />TR-65 7!15/94 Sage sedimentation ponds and spillway designs <br />TR-66 1!31(96 1994 Annual Report <br />TR-67 8/30/95 Oak #1 and #2 ponds <br />TR-68 7/05/95. 7 Deep development drill holes <br />TR-69 9!13/95 Remediation of a pit landslide <br />TR-70 3/21/97 199 Annual Report <br />TR-71 2118/98 Bond Release Plan Revisions <br />TR-72 10/04/96 A-3 Ditch, update hydrology and road maps <br />TR-73 1/21/97 Dozer basins and stock ponds <br />TR-74 2/14/97 Revise seed mix <br />TR-75 9/15/97 Revise groundwater program <br />TR-76 2/19/98 1996 Annual Report <br />TR-77 8/01/97 West Fi~une Gulch Pond N1 <br />TR-78 pending Annual Report <br />Bond Release <br />The Division approved a bond liability release on 2,511.7 acres of the Trapper permit azea on <br />February 12, 1998. This was a Phase I release of liability for backfilling, grading, and drainage <br />reestablishment. It was Trapper's first bond release. A Phase II release covering 1570.5 acres of <br />the Phase I release is in progress. <br />Trapper Mile 7 May 11, 1998 <br />