Laserfiche WebLink
Memo - Matt Hayes - 4 - February 23, 1990 <br />Stream Buffer Zones <br />I was unable to find any section of the permit requesting a variance from <br />Rule 4.05.18. Prior to the Division authorizing a variance from this rule, we <br />need information from the operator which will allow us to make the specific <br />findings required by Rules 4.05 .18 (1 )(a ), (b) and (c). Therefore, the <br />following adequacy question applies: <br />1.) So the permit document and the operation complies with Rule 4,05,18, <br />please provide plans that describe operations within stream buffer <br />zones. Such plans must specifically address the concerns stated in <br />Rules 4.05.18 (1 )(a ), (b ), (c) and 4.05.18(2) so the Division can make the <br />required findings. <br />/ern <br />cc: Susan Mowry <br />4417E <br />