Laserfiche WebLink
08-04-1998 11~38AM FROM J. E. STOVER 8 ASSOCIATES TO DMG P.02 <br />v, " <br />Wm. A. Bear - 2 - July 31,1998 <br />mining took place under any of the subject ditches or drainages and <br />monitoring data demonstrated that the revised water diversion method did <br />not harm the downstream water users (Roberts Stucker Ditch). The i3LM <br />depends on the DMG to enforce monitoring requirements. <br />The BLM investigated this issue in 1996 or 1997 and found that the Roberts <br />Stucker Ditch was actually gaining flow relative to the water being diverted <br />from the Overland Ditch. <br />I do not believe we owe Steve Wolcott anything. If he wants us to reinstate <br />monitoring SW-09, SW-11 and SW-12 he would need to deal with the DMG. <br />s <br />4 <br />TOTAL P.02 <br />