Laserfiche WebLink
<br /> <br /> <br />_~~_ <br />Stipulation No. Z6: <br />THE DIVISION DIRECTS TRINIDAD BASIN MINING COMPANY TO R?fEND ITS <br />POST-FfINZNG TOPOGFLaPXIC MAPS AND APPROPRIATE PERh12T APPLICATION <br />NARRATIVES TO SPECIFICALLY DISCUSS ITS PLAN TO RCCObfMODATE THE <br />PROJECTED BACKFILL MATERIAL BALANCE RESULTS PORTRAYED IN CORRECTED <br />TABLE V-1 OF THE A?•fENDEO PERhfIT APPLICATION. <br />THESE APPLICATION AMENDMENTS SHALL BE SUBMITTED TO THE DIVISION <br />FOR REVIEW NO LATER THAN 60 DAYS FOLiAWING APPROVAL OF THE <br />PERMIT. MINING SHALL NOT PROCEED BEYOND CUT NO. 13 OF PIT <br />NO. " PRIOR TO WRITTEN APPROVAL BY THE DIVISION OF THESE <br />AMENDMENTS. <br />With the acceptance of these stipulations, the operation is in compliance with the <br />requirements of this section. <br />XVIII. Mine Facilities, Coal Handling Structures, Support Facilities - <br />Rules 2.05.3(3), 2.05.3(7) and 4.09 <br />The mine facilities, coal handling structures, and suaport facilities sections of <br />the permit application have been reviewed by the Division for compliance. Infor- <br />mation can be found in Section 5.3.3 (pages V-IS - V-20) of the permit app~`r.t_`on. <br />The operation is in compliance with the requirements of this sectien. <br />XIX. Roads - Rules 2.05.3(3) and 9.03 <br />The applicant presents a discussion of road construction, maintenance, and reclama- <br />tion in Volume I, page VII-2 and v-9 (Section 5.3.2.3) of the permit application. <br />Road profiles, cross-sections, and grade inFormation are presented in Section <br />4.03.1(1-5) and Section 2.05.3(3) of the applicant's February 2, 1982 review response <br />document. Road drainage and culvert calculations are set Forth in Exhibit V-3 <br />of Volume I and Section 4.03.Z(S) of the February 2, 2982 review response document. <br />There are three primary haul road segments constructed at the mine. Haul Road No. 1 <br />is an existing haul road that had been for Pit No. 1. This road is to be reclaimed <br />after mining to a light use road for use by the Iandowner as access. However, the <br />applicant has not addressed the reclamation of this road. It is, therefore, <br />stipulated that: <br />Stipulation No. 16: <br />WITHIN 90 DAYS OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT A <br />HAUL ROAD RECLA?dATION PLAN TO THE DIVISION WHICH ;/ILL ADDRESS <br />RECLAPfATION OF TXE PIT NO. 1 HAUL ROAD. TN IS PLAN WILL, AT A <br />PfZNIMUPf, ADDRESS APPLICABLE DESIGN CRITERIA OF 4.03 FOR THE ROAD <br />TO BE LEFT, PLANS FOR TOPSOILING AND SEEDING, AND A DEMONSTRATION <br />THAT THE MATERIAL LEFT IN THE ROAD BASE WILL NOT CAUSE A fATERIAL <br />SHORTAGE ELSEWHERE IN TXE PERMIT AREA. TX ZS PLAN AND RECLAhfATION <br />ACTIVITIES SHALL BE IMPLEMENTED I!~]DIEDIA TELY UPON APPROVAL BY THE <br />DIVISION. <br />