Laserfiche WebLink
-9- <br />Reclamation c/i11 proceed contemporaneously with mining. Backfilled areas will be <br />graded, topsoiled and seeded. Vegetation characteristics will be monitored until <br />the post-mining conditions are approximately equal to adjacent areas of comparable <br />vegetation. The final reclaimed surface will blend in with the surrounding <br />undisturbed areas. <br />The loadout is located on Linden Avenue in Trinidad, Colorado, Coal is trucked from <br />the mine site along County Road 99.0 to Interstate 2s and south to the rail Zoadout, <br />At the tipple, the coal is dumped into a crusher, conveyed to a stockpile and then <br />loaded onto trains. <br />Reclamation at the loadout will consist of clearing the area of coal refuse, <br />ripping and grading the surface, reclaiming sediment ponds and seeding embankments <br />as necessary. The post-mining Land use will correspond to the industrial pre- <br />mising Land use, <br />