Laserfiche WebLink
Stipulation No. 4 <br />WHEN THE APPLICANT SUBMITS A <br />FORK OF MINNESOTA CREEK, THE <br />UPON MONITORING INFORMATION <br />MINING. <br />PERMIT APPLICATION TO UNDERMINE THE DRY <br />SUBSIDENCE PROTECTION PLAN SHALL BE BASED <br />COLLECTED DURING THE EARLIER PHASES OF <br />STATUS: Terminated <br />Stipulation No. 5 <br />FOLLOWING STOCKPILING, TOPSOIL STOCKPILES <br />REDISTRIBUTED FOR FIVE OR MORE YEARS SHALL <br />PERMANENT SEED MIX (EXCLUDING SHRUBS) AND <br />STATUS: Terminated <br />Stipulation No. 6 <br />THAT WILL NOT BE <br />8E SEEDED WITH THE PROPOSED <br />NOT THE TEMPORARY SEED MIX. <br />THE DIVISION DIRECTS MOUNTAIN COAL COMPANY, PRIOR TO ANY DISTURBANCE AT <br />THE UPPER WASTE PILE SITE, TO SUBMIT AN APPROPRIATE AMENDMENT TO THE <br />OPERATION PLAN WITHIN THE EXISTING PERMIT TO LIMIT EXTRACTION BENEATH <br />THE WASTE PILE AND WITHIN A DEFINED BUFFER ZONE TO PRIMARY DEVELOPMENT <br />ONLY. THE SURFACE BUFFER ZONE WILL BE DEFINED BY THE SUBSIDENCE ANGLE <br />OF DRAW. <br />STATUS: Future <br />Stipulation No. 7 <br />THE DIVISION DIRECTS MOUNTAIN COAL COMPANY, PRIOR TO ANY DISTURBANCE AT <br />THE UPPER WASTE SITE, TO INSTALL SEVERAL ELECTRONIC TILT METER TUBES <br />DOWNSLOPE FROM THE TOE OF THE PROPOSED WASTE STRUCTURE. THESE TILT <br />METER INSTALLATIONS SHALL BE INSTALLED AS SPECIFIED IN MCC'S AUGUST 15, <br />1985 SUBMITTAL. ONE INDICATOR SHALL BE INSTALLED WITHIN 160 FEET OF <br />THE TOE OF THE WASTE PILE CURRENTLY HALF WAY BETWEEN MONUMENTS 51 AND <br />54. THE SECOND SHALL BE LISTED APPROPRIATELY 100 FEET NORTHEAST OF <br />MONUMENT S2, 160 NORTH OF TOES OF THE WASTE PILE, AS INDICATED ON <br />DRAWING NO. MG-R C-001, INCLUDED IN THE PERMIT REVISION APPLICATION. <br />DURING THE INSTALLATION OF THESE TILT METER TUBES, THE OPERATOR SHALL <br />AUGER AND LOG THE SURFICIAL AND BEDROCK STRATIGRAPHY ENCOUNTERED. <br />AUGERING SHALL CONTINUE UNTIL THE OPERATOR HAS ESTABLISHED INTACT <br />BEDROCK OCCURRENCE. IF ANY EVIDENCE OF EXISTING LANDSLIDE DEPOSITS IS <br />ENCOUNTERED, THE OPERATOR SHALL DEFINE THE NATURE AND EXTENT OF THE <br />PRE-EXISTING SLOPE INSTABILITY. IF SUCH LANDSLIDE ACTIVITY IS <br />DISCERNED, THE OPERATOR WILL BE REQUIRED TO APPROPRIATELY RECONFIGURE <br />THE PILE DESIGN, PRIOR TO INITIATION OF ANY CONSTRUCTION ACTIVITY. <br />STATUS: Future <br />