My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL38304
DRMS
>
Back File Migration
>
General Documents
>
GENERAL38304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:58:07 PM
Creation date
11/23/2007 9:36:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
2/19/1993
Doc Name
Mining Permit (dated 7/31/91 to 7/31/96)
From
MOUNTAIN COAL CO
To
DMG
Permit Index Doc Type
PERMIT LEGAL DOCUMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. 28 <br />MOUNTAIN COAL COMPANY OR ANY SUCCEEDING OPERA70R OF THE WEST ELK MINE <br />MUST CONTINUE TO SUBMIT TO THE DIVISION AN ANNUAL HYDROLOGIC REPORT. <br />THIS REPORT SHALL INCLUDE AN ANALYSIS OF ALL HYDROLOGIC DATA GATHERED <br />DURING THE YEAR, AN ASSESSMENT OF THE IMPACTS OF MINING DURING THE YEAR, <br />AND AN ESTIMATE OF THE PROJECT IMPACTS OF MINING IN THE FOLLOWING YEARS. <br />THIS REPORT SHALL ASSESS THE IMPACTS OF MINING ON THE QUALITY AND <br />QUANTITY OF WATER IN SURFACE STREAMS, SPRINGS, GROUND WATER AQUIFERS, <br />MINE INFLOW AND MINE DISCHARGE. <br />STATUS: Terminated <br />Stipulation No. 29 <br />WITHIN NINETY (90) DAYS OF APPROVAL OF THE LOWER WASTE PILE PERMIT <br />REVISION, WECC SHALL SUBMIT A REVISED WATER MONITORING PLAN THAT INCLUDES <br />MONITORING OF THE WASTE PILE. THE PLAN SHALL INCLUDE DIRECT SAMPLING OF <br />THE SEDIMENT POND AND UNDERDRAINS DISCHARGE TWICE PER YEAR DURING THE <br />SECOND AND THIRD QUARTER OF THE YEAR. THE PARAMETERS SHALL BE THE FULL <br />LIST OF CHEMICAL CONSTITUENTS, AS LEAST FOR THE FIRST YEAR. MCC MAY <br />REQUEST AN ADJUSTMENT OF THE MONITORING REQUIREMENTS AFTER THE FIRST <br />YEAR, DEPENDING ON THE RESULTS OF THE MONITORING. <br />STATUS: Complied With <br />Stipulation No. 30 <br />MCC MUST SUBMIT ADDITIONAL BOND, IN THE AMOUNTS DESCRIBED IN THE LOWER <br />WASTE PILE PERMIT REVISION APPLICATION, AT LEAST THIRTY (30> DAYS PRIOR <br />TO THE COMMENCEMENT OF CONSTRUCTION OF PHASES III, IV, AND V OF THE LOWER <br />WASTE PILE. THESE ADDITIONAL BONDS MUST BE APPROVED AND ACCEPTED BY THE <br />DIVISION PRIOR TO CONSTRUCTION FOR THESE PHASES. <br />STATUS: Terminated <br />Stipulation No. 31 <br />MCC SHALL FORWARD FIVE (5) COPIES OF THE COLORADO DEPARTMENT OF HIGHWAYS' <br />WRITTEN APPROVAL FOR ACTIVITIES WITHIN 100 FEET OF THE OUTSIDE <br />RIGHT-OF-WAY OF COLORADO HIGHWAY 133 WITHIN THIRTY (30) DAYS OF APPROVAL <br />OF THE PERMIT REVISION APPLICATION. <br />STATUS: Complied With <br />Stipulation No. 32 <br />THE APPLICANT SHALL MONITOR THE TWO MONITORING WELLS LOCATED OVER THE <br />FIRST PANEL TO BE SUBSIDED ONE YEAR PRIOR TO MINING THIS PANEL. THE <br />APPLICANT SHALL SUBMIT TO THE REGULATORY AUTHORITY GROUND WATER LEVEL <br />DATA AND WATER QUALITY DATA PRIOR TO MINING THIS PANEL. <br />STATUS: Future <br />
The URL can be used to link to this page
Your browser does not support the video tag.