Laserfiche WebLink
Stipulation No. 4 <br />WHEN THE APPLICANT SUBMITS A PERMIT APPLICATION TO UNDERMINE THE DRY FORK <br />OF MINNESOTA CREEK, THE SUBSIDENCE PROTECTION PLAN SHALL BE BASED UPON <br />MONITORING INFORMATION COLLECTED DURING THE EARLIER PHASES OF MINING. <br />Matthew Hayes of MLRD recommended in March 1990, that this stipulation be <br />terminated because it had been incorporated into the permit document. <br />However, with the reorganization of the permit, TR-59, this statement was not <br />included in the text. Mountain Coal Company has now incorporated this <br />statement on page 2.05-147 during the 1991 renewal process. <br />STATUS: Terminated November 30, 1992 <br />Stipulation No. 5 <br />FOLLOWING STOCKPILING, TOPSOIL STOCKPILES THAT WILL NOT BE REDISTRIBUTED <br />FOR FIVE OR MORE YEARS SHALL 8E SEEDED WITH THE PROPOSED PERMANENT SEED <br />MIX (EXCLUDING SHRUBS) AND NOT THE TEMPORARY SEED MIX. <br />This requirement has been incorporated into the permit on page 2.05-39 during <br />the 1991 renewal process. <br />STATUS: Terminated November 30, 1992 <br />Stipulation No. 6 <br />THE DIVISION DIRECTS MOUNTAIN COAL COMPANY, PRIOR TO ANY DISTURBANCE AT <br />THE UPPER WASTE PILE SITE, TO SUBMIT AN APPROPRIATE AMENDMENT TO THE <br />OPERATION PLAN WITHIN THE EXISTING PERMIT TO LIMIT EXTRACTION BENEATH THE <br />WASTE PILE AND WITHIN A DEFINED BUFFER ZONE TO PRIMARY DEVELOPMENT ONLY. <br />THE SURFACE BUFFER ZONE WILL BE DEFINED BY THE SUBSIDENCE ANGLE OF DRAW. <br />This area has been undermined and subsided; therefore, the stipulation no <br />longer applies. <br />STATUS: Forgiven <br />Stipulation No. 7 <br />THE DIVISION DIRECTS MOUNTAIN COAL COMPANY, PRIOR TO ANY DISTURBANCE AT <br />THE UPPER WASTE SITE, TO INSTALL SEVERAL ELECTRONIC TILT METER TUBES <br />DOWNS LOPE FROM THE TOE OF THE PROPOSED WASTE STRUCTURE. THESE TILT METER <br />INSTALLATIONS SHALL BE INSTALLED AS SPECIFIED IN MCC'S AUGUST 15, 1985 <br />SUBMITTAL. ONE INDICATOR SHALL BE INSTALLED WITHIN 160 FEET OF THE TOE <br />OF THE WASTE PILE CURRENTLY HALF WAY BETWEEN MONUMENTS 51 AND 54. THE <br />SECOND SHALL 8E LISTED APPROPRIATELY 100 FEET NORTHEAST OF MONUMENT S2, <br />160 NORTH OF TOES OF THE WASTE PILE, AS INDICATED ON DRAWING N0. MG-R <br />C-001, INCLUDED IN THE PERMIT REVISION APPLICATION. DURING THE <br />INSTALLATION OF THESE TILT METER TUBES, THE OPERATOR SHALL AUGER AND LOG <br />THE SURFICIAL AND BEDROCK STRATIGRAPHY ENCOUNTERED. AUGERING SHALL <br />-2- <br />