Laserfiche WebLink
Stipulation No. 37 <br />MOUNTAIN COAL COMPANY WILL SUBMIT REVISED PAGE 3-35 AND EXHIBIT 3.2.7.1A <br />AND BOND CALCULATIONS FOR RECLAMATION BY AUGUST 6, 1989. <br />This stipulation was added to the approval of Minor Revision 65. <br />STATUS: Complied with on August 7, 1989 <br />Stipulation No. 38 <br />MOUNTAIN COAL COMPANY WILL INCORPORATE DETAILS OR A REFERENCE TO THE WEED <br />CONTROL PLAN INTO THE PERMIT APPLICATION BY SEPTEMBER 14, 1990. <br />This stipulation was imposed as part of Minor Revision 68 and has been <br />incorporated into the permit on page 2.05-47. <br />STATUS: Terminated on September 26, 1990 <br />Stipulation No. 39 <br />PRIOR TO THE CONSTRUCTION OF THE COAL STORAGE PAD, A PLAN MAP MUST BE <br />SUBMITTED SHOWING THE PROPOSED TOPOGRAPHY OF THE PAD. THIS MAP MUST SHOW <br />THE LOCATION OF THE CLEAN WATER DITCHES, SEDIMENT DITCHES, AND SEDIMENT <br />TRAP AND CULVERTS. <br />This stipulation was added to the approval of Technical Revision 58. <br />STATUS: Complied with on November 25, 1991 <br />Stipulation No. 40 <br />PRIOR TO DISTURBING THE AREA OF THE STORAGE PAD, MOUNTAIN COAL COMPANY <br />MUST SUBMIT CALCULATIONS TO SHOW THAT THE SEDIMENT POND RECEIVING THE <br />RUN-OFF FROM THE STORAGE PAD IS SUFFICIENTLY SIZED TO HANDLE THE <br />CALCULATED VOLUME OF WATER. <br />This stipulation was added to the approval of Technical Revision 58. <br />STATUS: Complied with on November 25, 1991 <br />Stipulation No. 41 <br />PRIOR TO THE IMPORTATION Of FILL MATERIAL TO CONSTRUCT THE COAL STACKING <br />TUBE PAD, MOUNTAIN COAL MUST SUBMIT BOND CALCULATIONS AND UPDATE THE <br />RECLAMATION PLAN FOR THE REMOVAL OF THE FILL MATERIAL. THE SOURCE OF THE <br />FILL MATERIAL MUST BE IDENTIFIED. IF GOB IS TO BE USED, THIS MUST BE <br />PROPOSED AS A TECHNICAL REVISION AND BE SUPPORTED WITH DESIGNS THAT MEET <br />THE DIVISION'S PERFORMANCE STANDARDS FOR COAL WASTE BANKS. PLANS MUST BE <br />CERTIFIED BY A QUALIFIED ENGINEER. <br />_12_ <br />