Laserfiche WebLink
Stipulation No. 32 <br />THE APPLICANT SHALL MONITOR THE TWO MONITORING WELLS LOCATED OVER THE <br />FIRST PANEL TO BE SUBSIDED ONE YEAR PRIOR TO MINING THIS PANEL. THE <br />APPLICANT SHALL SUBMIT TO THE REGULATORY AUTHORITY GROUND WATER LEVEL <br />DATA AND WATER QUALITY DATA PRIOR TO MINING THIS PANEL. <br />STATUS: Complied With <br />Stipulation No. 33 <br />SHOULD THE APPLICANT ENCOUNTER MORE GROUND WATER THAN ANTICIPATED, PRIOR <br />TO THE DISCHARGE OF EXCESS MINE WATER, THE APPLICANT SHALL PROVIDE AN <br />ANALYSIS OF ANTICIPATED WATER QUALITY AND QUANTITY, AND AN ASSESSMENT OF <br />THE EFFECTS ON THE RECEIVING STREAM. <br />The requirement has been incorporated into the permit document and can be <br />found on page 2.05-29. <br />STATUS: Terminated <br />Stipulation No. 34 <br />MOUNTAIN COAL COMPANY SHALL COLLECT AT LEAST ONE COMPOSITE, <br />REPRESENTATIVE SAMPLE OF THE DISCHARGE WATER FROM THE OLD PORTAL AND HAVE <br />IT PROPERLY ANALYZED FOR THE FOLLOWING PARAMETERS: <br />pH (field) <br />Conductivity at 25 25 deg <br />Temperature (field) <br />Dissolved Oxygen (field) <br />Total Suspended Solids <br />Total Dissolved Solids <br />Sodium Adsorption Ratio <br />Bicarbonate <br />Calcium <br />Chloride <br />Magnesium <br />Sodium <br />Sulfate <br />Aluminum <br />C (field) Arsenic <br />Cadmium <br />Copper <br />Iron <br />Dissolved Iron <br />Lead <br />Manganese <br />Dissolved Manganese <br />Mercury <br />Molydenum <br />Selenium <br />Zinc <br />ALL PARAMETERS ARE TOTAL SPECIES UNLESS OTHERWISE SPECIFIED. RESULTS ARE <br />TO BE FORWARDED TO MLRD AS SOON AS THEY ARE AVAILABLE. <br />The requirement has been incorporated and completed into page 2.05-51 and 53 <br />of the permit application. <br />STATUS: Complied With <br />-10- <br />