<br />Mr. Murari Shrestha <br />-2- <br /> <br />Project No. CS-142-02 (original plus Amendment No. 1) <br />The following 16 drill sites comprise this project: <br />Original sites (3): <br />Sec. 2, T2N, R101W: 21012-19 <br />Sec. 34, T3N, R101W: 310134-10 <br />Sec. 35, T3N, R101W: 310135-8 <br />Amendment No. 1 Sites (13): <br />Sec. 1, T2N, R101W: 21011-9, 21011-10, 21011-11, 21011-12, 21011-13, <br />21011-14, 21011-15, 21011-16, and 21011-17 <br />Sec. 36, T3N, R101W: 310136-5, 310136-6, 310136-7, and 310136-8 <br />Drilling activities occurred during 1985 and 1986, and the abandonment <br />report was submitted on January 27, 1987. The Division inspected the <br />sites on April 30, 1987 and determined that all required drill site <br />regrading, topsoil redistribution, and drill hole sealing work had been <br />successfully completed. New plant growth was evident on all revegetated <br />areas, however percent plant cover on most sites did not appear to meet <br />the requirements for successful revegetation. It appears that it will <br />take at least one or two more growing seasons for the vegetation to meet <br />required performance standards. The drill sites were seeded in the fall <br />of 1986. As such, the Division is recommending only partial release of <br />the bond for this project at the present time and will retain E3,800.00 <br />(16 sites x E300.00 per site) until revegetation is deemed successful. <br />4. Pro.iect No. CX-142-03 <br />The following 7 drill sites comprise this project: <br />Sec. 1, T2N, R101W: 21011-8 <br />Sec. 6, T2N, R100W: 21006-1, 21006-2, 21006-3 <br />Sec. 31, T3N, R100W: 310031-1 <br />Sec. 36, T3N, R101W: 310136-3, 310136-4 <br />Drilling activities occurred during 1985, and the abandonment report was <br />submitted on January 27, 1987 along with the report for drilling project <br />no. CX-142-02. The Division inspected the sites on April 30, 1987 and <br />determined that all required drill site regrading, topsoil <br />redistribution, and drill hole sealing work had been successfully <br />completed. Plant growth appeared to be progressing well considering that <br />this is only the second growing season for revegetated areas, however not <br />all sites appeared to meet the requirements for successful revegetation. <br />It appears that it will take at least one more growing season for the <br />vegetation to meet required performance standards. As such, the Division <br />is recommending only partial release of the bond for this project at the <br />present time and will retain 52,100.00(7 sites x E300.00 per site) until <br />revegetation is deemed successful. <br />