Laserfiche WebLink
,-r° <br />I(aiserSteel <br />Resources <br />Mr. Larry Routin <br />Colorado Dept. of Natural Resources <br />Mined Land Reclamation Division <br />Room 215 <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Page two <br />Kaiser Steel Resources. Inc <br />8300 Unca Avenue. Suite 301 <br />kancho Cucamonga. California 91730 <br />(7141944-4155 <br />~714~ 414-4758 Telecopier <br />On November 16, 1989 Huerfano County Road and Bridge Boss, Claude Pino <br />came to the mine site and stated that the county would like to take out Texas <br />Crossing that we had reestablished on the County Road where the west diversion <br />ditch had been. I agreed to supply him with the fill needed to place a 30" culvert <br />under the road, which Mr. Pino said had always been there. The county crews <br />did all the work at the county's expense. <br />Seeding was begun on November 21, 1989. One and a half tons per acre of <br />straw mulch was placed over entire area. The area was fertilized before the <br />seeding was done, fertilizer rate was determined by soil samples taken of topsoil <br />piles on September 1, 1989 and tested by a soils lab. Straw was crimped in by <br />using a disc pulled with a farm tractor. Revegetation was completed on November <br />28, 1969. <br />In an ongoing maintenance program the banks of the pond where disced and <br />reseeded at the same time the reclaimed area was done. New rip rap was placed <br />in both inlets to the pond, to help control erosion that was occuring. The south <br />end of the west diversion ditch was fenced to make sure no cattle could get on <br />the reclaimed areas. <br />If you should have any questions, please contact me. <br />Sincerely, <br />~ i~ <br />M ke Keegan <br />Mine Manager <br />Inland Empira Commerce Cem er Kaiser Eagle Moum sin Inc `romans Union War er Company Kaiser Nlasre Trearmem. Int <br />