Laserfiche WebLink
The Kerr Coal Company must submit within 30 days of the receipt of this letter a technical <br />revision for an incidental boundary change to include the two road segments into the <br />permit area. The road to the loadout should be permitted as a haul road. Kerr must <br />submit a demonstration that this road meets the performance standards of Rule 4.03.1 and <br />included a P.E. Certification. The road used as a mine access road should be permitted as <br />an access road and a demonstration that this road meets the performance standards of Rule <br />4.03.2 should be submitted. <br />It is important that this problem be resolved in a timely matter. If you have any questions <br />please feel free to call me. , <br />Sincerel <br />:~ <br />Randall P. Price <br />Reclamation Specialist <br />RPP/rpp/kerroad.wp <br />CERTIFIED MAIL NO. P 860 170 752 <br />Return Receipt Requested <br />cc: Jay James <br />