Laserfiche WebLink
.,. , <br />....:. <br />AC GichmenC A <br />STIPULATIONS <br />Stipulation No. 1 <br />FLOLJ PIEASUREPIENTS AND IJATER SA.`tPLL•S 2NST BE TAKE?] TI•!ICE A YEAR FROP1 <br />THE THREE SITES IDENTIFIED 0;1 PtAP 5 OF TLIIS DOCiPfENT. 'IHE TliJES OF <br />FLOLJ MEASUREMENT PNST DE ONCE DURING SPRING Si:OhT1ELT AAT) OI:CE DURING <br />A STOIL`i EVENT. THE SAPfE PARAtiF.TERS FOR ANALYSIS SHOULD BE USED AS <br />4!ERE USED FOR THE SOAP REPORT. <br />Stipulation No. 2 <br />TAE APPLICAIJ'f PNST SAPiPLE AiW ANALYZE THE SOIL TYPES OF 4fAZ.\':0 LON9, <br />(TI.1) AND COUNTERS-TRAVESSILLA COPIPLEX (LIE). THE SOILS ItJFOR.`tATION <br />PNST INCLUDE DEPTH OF SOIL HORIZONS, AND AN ANALYSIS OF THE FOLLOIJING <br />PARAPIETERS IN ACCORDANCE WITH RULE 2.04.9: pH, ELECTP.000NDUCTIVITY, <br />SAR, TE.YTURE, PARTICAL SIZE ANALYSIS, SELEPIIUPi, PERCENT ORGANIC <br />iIAT'fER,A]JD SATURATION PERCENTAGE.. THE INFOR`fATION lNST BE PROVIDED <br />TO THE DIVISION iJIT}IIN 6 PIONTHS AFTEP. PER`fIT ISSUANCE. <br />Stipulation No. 3 <br />DESIGPiS CERTIFIED BY A QUALIFIED REGISTERED PROFESSIONAL ENGINEER FOR <br />A SEDL`fENT FOP7D FOR THE FACILITIES AREA OR AN ALTERNATIVE SEDIMEPJT <br />CONTROL PLAN 2NST BE PROVIDED TO THE DIVISIONI PRIOR TO COPII•tE1tCETIENT <br />OF ANY SURFACE PiINING ACTIVITIES IN ACCORDANCE WITH RULE 2.05.3(4). <br />Stipulation No. 4 <br />PRIOR TO CONSTRUCTIPIG OR P.ECONSTRUCTINC SLDII~IL•NT PONDS A AND K, <br />DOCUPfENTATI0IJ OF N.P.D. E. S. APPROVAL PNST BE PROVIDED TO THE DIVISION. <br />Stipulation No. 5 <br />ROAD DESIGNS. FOR IiAUL ROADS, ACCESS ROADS, AN'D LICIIT DUTY ROADS PNST <br />BE CERTIFIID BY A QUALIFIID, REGISTERED PROFESSIONAL ENGINEER AND <br />PNST BE SUBPIITTED TO AND APPROVED BY THE DIVISIOI PRIOR TO THE <br />INITIATION OF ANY SURFACE COrV. MINING A.~D RECLAPIATION OPERATIONS <br />41ITHIN THE NELJ P£RPIIT AREA. <br />Stipulation No. 6 <br />PRIOR TO Tl1E COPIPIENCEP[EP1T OF AP1Y SURFACE COAL PIINIP:G AND RECLAI(ATION <br />OPERATIONS AT TI•E PRYOR PANE. THE APPLICANT PNST PP.OVIDE A TOPSOIL <br />SALVAGE, PLAN krlT}I JUSTIFICATIOPI OF SOIL SALVAGE DEFCHS IN ACCORDANCE <br />WITH RULE 2.05.4(Z)(d). <br />Stipulation PIo. 7 <br />PRIOR TO INITIATION OF SURFACE. AND COAL aINISG AND RECLAPG\TION <br />OPERr1TI0N5 AT THE PRIOR PIINL', A DESCRIPTIOPI OF THE COAL HANDLING <br />STRUCTURES AND FACILITIES PNST 6E SUPPLIED 'f0 TIIE DIVISION IN <br />ACCORDANCE 4!ITII MILE 2.05.3(7) AND 4.04. <br />Stipulation No. 8 <br />1HE APPLICA\"C PNST PROVIDE CERTIFICATION TI1AT A VALID PUBLIC LIABILITY <br />INSURANCE, POLICY 4!ILL BE I1J P'ORCE FOR TILE PROPOSED SURFACE COAL I•fI1JING <br />AN'D RECLAPIATION OPERATIONS Iii ACCORDANCE 4!ITH RULE 2.03.9 PP,IOR TO <br />INITIATING ANY SURFACE C0,1L MINING OPERATIONS. <br />Sitpulation No. 9 <br />THE APPLICA:T ?LUST SUBPII'f A COPY OF THE APPROVED L`tISSIOPiS PER:fIT <br />FR0;1 THE COLORADO llEPART1iEPIT OP HEALTH OR A COPY OF THE PEPJIIT <br />AFFLICATIO': PP,IOR TO INITIATING ANY SURFACE. COALr1ININC OPEPATIONS. <br />