Laserfiche WebLink
PERK)DIC STATEMENT FOR PARTIAL PAYMENT N0. 4 <br />PROJECT: Hawks Nest Coal Sib Demolition Reclamation <br />FOR THE PERIOD 6/16/94 TO 8/2/94 , INCLUSNE <br />OWNER: State of Colorado, Division of MinuaLs & Geology <br />Sheet No. 1 <br />CONTRACTOR: Miners Inc. <br />9137 E. Minual Circle, Suite 160 <br />Englewood, Colorado 80112 <br />STATEMENT OF WORK WORK PERFORMED <br />Item Description Contract Prev ious This Estimate Total to Date <br /> Unit $ Unit $ Unit $ Unit $ <br />1.0 Mobilization/Demobilization L.S. $42,248 100% $42,248 0% EO 10096 542,248 <br />2.0 Structural Demoktion & Disposal <br />. a. Structural Demolition <br /> Demo Headhouse L.S. $19,250 100% $19,250 0% $0 100% $19,250 <br /> Demo Conveyor L.S. $45,000 100% $45,000 0% $0 100% $45,000 <br /> Drill & Blast Silo #1 L.S. $46,550 10096 $46,550 0% $0 100% $46,550 <br /> Drill & Blast Silo #2 L.S. $46,550 100% $46,550 0% $0 100% $46,550 <br /> Demo Truck Dump & Scale L.S. $14,546 100% $14,546 0% $0 100% $14,546 <br /> Sub-Total $171,896 E171,896 $0 $171,896 <br />b. Disposal/Borrow Area <br /> ExavateFallingPit L.S. $27,120 100% $27,120 0% $0 100% $27,120 <br /> Demo & Bury Silos L.S. $38,550 10096 $38,550 0% $0 100% $38,550 <br /> Finish Grade Site LS. $4,500 100% $4,500 0% $0 100% $4,500 <br /> Repair Road L.S. $3,500 100% $3,500 0% $0 10096 $3,500 <br /> Sub-Total $73,670 $73,670 $0 573,670 <br />3.0 Additional Dozer Houns 0 $0 0% $0 0% $0 0% $0 <br />4.0 Denver Rio Grande Flagmen 32 Hrs. $1,594 0% - $0 100% $1,594 100% $1,594 <br />5.0 Change Order #1 (Seasonal Conditions) L.S. E3,735 100% $3,735 0% $0 100% $3,735 <br />6.0 Change Order #2 L.S. $3,450 0% $0 100% $3,450 100% $3,450 <br />Total Work kerns $296,593 <br />Material on Hand <br />u• <br />Total $296,593 <br />$291,549 $5,044 $296,593 <br />$0 $0 $0 <br />$291,549 $5,044 5296,593 <br />!\. <br />