Laserfiche WebLink
-~- <br />backfilling operation, tempordrily stockpiled, and upon completion of back- <br />filling and smooth grading it will be redistributed over the disturbed areas <br />along with topsoil materials previously salvaged to establish an adequate seed- <br />bed for vegetation. <br />Various soil amendments may be used to modify the seedbed conditions if needed <br />to ensure successful establishment of a vegetative cover. Finally, revegetation <br />activities for the mixed shrub and riparian plant communities will establish a <br />permanent vegetation cover, of the same seasonal variety, native to the area. <br />For specific details on the reclamation plan for the Blue Ribbon Mine, see <br />Section 2.05.4, page I08 of the permit application. <br /> <br />