My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL37931
DRMS
>
Back File Migration
>
General Documents
>
GENERAL37931
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:53 PM
Creation date
11/23/2007 9:23:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
General Documents
Doc Date
2/28/1994
Doc Name
MEMO TAILING DAM HYDROLOGY AND OPERATION
From
CYPRUS CLIMAX METALS
To
JAY JONES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />In all of these snowflood and rainflood probable maximum events the tailings <br />impoundment completely contains the projected runoff water volumes witPiout <br />overtopping in these "worse case" flood scenarios. <br />In the event of large flood inflows into the tailing pool, emergency spillway would begin <br />discharge upon the pool level reaching 800 feet of beach, the discharge would <br />maximize at a rate of 135 CFS or 270 acre-feet per day. In extreme conditions the <br />decant pipeline would be utilized to discharge an additional 135 CFS or 270 acre-feet <br />per day. Together these spillways would discharge 270 CFS or 540 acre-leet per day. <br />8y utilizing this emergency discharge the tailing pool would be rapidly drawn down <br />approximately 1 foot per day, thereby reestablishing beach at the rate of 150 feet per <br />day, achieving the desired 1000 foot of beach in approximately 7 days. These <br />discharges would be covered under Henderson's NPDES permit for a discharge in the <br />documented 10 year 24 hour precipitation event. <br />DAM STABILITY <br />Woodward Clyde Consultants conducted a static stability analysis on #1 tailings dam <br />in July 1992 utilizing UTEXAS3 software and the Spencer Method in a report: "Slope <br />Stability Study Henderson Mill Tailings Dam #1". The results of this study (summary <br />attached) indicate a factor of safety of at least 2.39 under existing dam configuration. <br />To evaluate stability during a potential flood event, the study was repeated utilizing a <br />raised phreatic surtace. In this secnario the phreatic surtace was assumed to be <br />located at a level of 10 feet from the dam face in all piezometers, then projected thru <br />the dam interior to the surface at a point 400 feet from the crest, which corresponds to <br />the sand/slime interface. The sand above the sand/slime interface is believed to be <br />free draining and would not impeed water movement even if the pool were to cover <br />this point in a flood condition. The calculated dam safety factor in the raisE~d phreatic <br />condition is at least 1.78. The free draining sand assumption is illustrated during <br />summer spigot deposition when tailing slurry is deposited at the dam crest. As the <br />tailing is deposited at the crest, the water contained drains quickly and does not cause <br />an increase in the phreatic level as measured monthly at the piezometers. Therefore <br />the dam is expected to remain stable during a PM flood situation where the tailing <br />water pool could approach to within 250 feet of the crest line for a short fe~a days. <br />CLOSE <br />The #1 tailing dam impoundment will with stand probable maximum flood events, even <br />should they occur when the process water system is at maximum operation storage <br />limits. All referenced documentation is maintained in the mill library should specific <br />questions arise. <br />
The URL can be used to link to this page
Your browser does not support the video tag.