My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL37929
DRMS
>
Back File Migration
>
General Documents
>
GENERAL37929
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:53 PM
Creation date
11/23/2007 9:23:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
General Documents
Doc Date
9/21/2004
Doc Name
Construction Quality Assurance Report
From
CC&V
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IVc Summary No. 18 Page 3 043-2170 <br />Golder observed geomembrane deployment, documenting ambient temperature, panel dimensions, <br />thickness, seaming, tie-in overlap, and seam testing (trial seams, pressure testing). Geomembrane <br />installed in the Phase IVc OSA met the project specifications. <br />Golder visually observed the placement of DCF in the Phase IVc OSA area. Golder CQA monitors <br />(one monitor per dozer when dozers aze greater than 50 feet apart) observed DCF placement and <br />verified minimum thickness of 2 feet for finish grade, and 4 feet for haul traffic (i.e., Caterpillaz <br />Mode1740 articulated trucks). <br />Golder observed placement of HVSC piping in the Phase IVc OSA, verifying installation and layout <br />per the prof ect plans. <br />Laboratory Tests <br />Golder obtained one QA sample of soil liner fill (SLFc-QA-21) and one QA sample of drain cover <br />fill (DCFc-QA-8) for laboratory index testing. The completed tests met the requirements of the <br />specifications and the results aze presented in Attachment B. <br />Meetings <br />CC&V held a Weekly Contractors' meeting on September 8, 2004. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. The next weekly meeting will be held on <br />September 14, 2004 at 10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment A. <br />Sincerely, <br />"~ ~-•-""--~ 1 <br />6~ir ~~~ ~1~~~~ <br />RonDiDonato -~~L/ <br />Project Resident <br />Pharr Nc 185cptcmbcr OS-Scpranbcrll 2006 Golder Associates lnc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.