Doc Name
Construction Quality Assurance Report
From
CC&V
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GOI(~T <br />-Associates <br />September 15, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Project No.: 043-2170 <br />RE: Summary No. 18: September 5 through September 11, 2004 <br />Cresson Project Phase IVc Construction Quality Assurance <br />Dear Mr. Roberts: <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Nc Construction Quality <br />Assurance (CQA) services performed for the Cresson Project during the period of September 5 through <br />September 11, 2004. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 35° F to 50° F, and highs ranged from 59° F to 79° F. Weather <br />observations were made on seven days of this seven-day reporting period. <br />Construction Svnopsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthworks contractor for the Phase Nc <br />construction. Ames conducted Phase Nc construction activities on fo-~ur days of this seven-day <br />reporting period (September 7 through September 10, 2004). Poly-Flex conducted Phase Nc <br />construction activities on four days of this seven-day reporting period (September 7 through September <br />10, 2004). <br />Phase IVc <br />Ames continued limited Structural Fill (SF) cut to fill and slope re-contouring activities along the Phase <br />Nb /Phase Nc tie-in azea above the LOB. <br />Ames continued excavation and constmction of two Leak Detection Trenches (LDT) and their <br />respective extensions on the eastern portion of the Phase Nc VLF. Ames constructed approximately <br />150 feet of LDT during this reporting period. <br />Ames hauled, placed, and compacted Soil Liner Fill (SLF) material into the Phase Nc OSA, on the <br />Phase IVc 18 September 5-September 11, 2004 043-2170 <br />