Laserfiche WebLink
iii iiiiiiiiiiiii iii <br />999 <br />ABR S <br />EASTSIDE COAL COMPANY, INC. <br />r.o. oox 161 <br />Sit t, Colorado 81652 <br />(3Qi) 87(x2944 <br />RF~~E!~`FD <br />August 20, 1993 <br />Barbara Pavlik, Reclamation Assistant <br />Division of Minerals and Geology <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Re: Eastside Mine <br />Permit Number C-84-063 <br />Dear Ms. Pavlik: <br />AUG 26 1993 <br /> <br />The Eastside Mine will resume mining operations on August 23, 1993. <br />Subsidence monitoring will be performed quarterly. Surface water <br />flow and field parameters will continue to be monitored on a monthly <br />basis, as required in Stipulation No. 1 of the Mining and Reclamation <br />Permit. Surface water will be sampled semi-annually for the full <br />suite of chemical parameters. Ground water will be monitored for <br />field parameters quarterly and annually for the full suite of <br />chemical parameters. <br />Sincerely, <br />Stephen Sel <br />General Ma ager <br />SS/11 <br />