Laserfiche WebLink
I ~ III ~IIIIIIIIIIIIIII <br />~ ~ ) ~5. DEPARTMENT Of A6RICUlTURE sr~r[ or m•o~.oo SO!!. CONSERVATION SERVICE <br />/ - April 1984 <br />COIARADO RANGE NOTE N27 <br />To: All Offices <br />From: Edward C. Dennis, State Range Conservationist <br />Proposed Method for Determining Percent Canopy Cover of Shrubs <br />This technical note Tray be used to determine percent canopy cover of shrubby <br />species. Zt may also be used to estimate percent canopy cover of Pinyon and <br />Juniper trees, or you may use woodland Tech Note No. 13, February 1981, WNTC <br />by William J. Saue rwein. <br />Percent canopy cover can be determined for one species or for several <br />species added together. This method has not been field tested, but in <br />theory it should give a more accurate estimate than visual estimates. It is <br />my objective to carry this procedure further to where pounds of production <br />can be estimated for individual species. It will take time to develop <br />production tables as a considerable amount of clipping and weighing will <br />have to be done in the field. <br />The type of transect that we will use is the same one as used by the <br />Foresters for measuring site indexes for Pinyon-Juniper and other trees. <br />(Refer to Woodland Tech Note No. 13.) <br />This procedure can be used to determine percent canopy cover of shrubs to be <br />controlled under the Brush Management Spec (314). <br />Procedure for Determining Percent Canopy Cover of Shrubs <br />Stand Examination By Zig-Zag Transect: <br />1. Choose a direction of travel which will take you through the shrub stand <br />so as to see a good cross section of it. You could elect to go in a <br />cardinal direction or toward a visible landmark. On a sunny day, use <br />the sun as a direction marker. Go toward it, away from it, or at some <br />angle to or from it. <br />2. Zt should be determined before starting what shrub you are going to <br />inventory. <br />3. Select a starter shrub which is part of the stand to be measured. No <br />measurements are made of the starter shrub, it serves only as a starting <br />point. <br /> <br />