My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL37791
DRMS
>
Back File Migration
>
General Documents
>
GENERAL37791
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:47 PM
Creation date
11/23/2007 9:19:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
General Documents
Doc Date
4/5/1999
Doc Name
CONSTRUCTION PERMIT
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 Colorado Department of Public Health and Environment <br />Construction Permit Air Pollution Control Division <br />TWENTYMILE COAL COMPANY <br />Permit No. 93R01204 <br />Initial Approval -Modification-5 <br />ATTACHMENT A [CONTINUATION - 2] <br />DETAILS OF EQUIPMENT /ACTIVITIES COVERED UNDER THIS FACILITY-WIDE PERMIT <br /> DESCRIPTION <br />AIRS MAKE, MODEL, SM, DESIGN RATE, CAPACITY, DIMENSIONS, REMARKS <br />ID OPERATION RATE,CONSUMPTION,THROUGHPUT, PRODUCTION, SPECIFIC PROVISIONS <br /> EMISSION COKTROLS <br />110 TRANSFER POINTS ON BELT CONVEYOR: <br /> NUMBER OF TRANSFER f'OOJ"TS: I <br /> QUANTITY OF COAL CONVEYED: 10,000,000 TONS PER YEAR. OVERALL CONTROL EFFICIENCY <br /> FORTS!' ANU PM~o IS A MNIMUM <br /> EMISSIONS OF PARTICULATE MATTER CONTROLLED BY ENCLOSURES OF 90.0 %. <br />112 RECEMNG AND CONVEYING COAL AT I'IPPLEg2: <br /> QUANTITY OF COAL RECEIVED (ONE DUMP): 2,000,000 TONS PER YEAR. <br /> QUANTITY OF COAL CONVEYED:2,000,000 TONS PER YEAR OVERALL COMIROL EFFICIENCY <br /> FOR TSP AND PM~° IS A MINIMUM <br /> EMISSIONS OF PARTICULATE MATTER CONTROLLED BY ENCLOSURES. OF 85.0 %. <br />113 PRIMARY CRUSHER HOUSE: <br /> ONE (1) MAKE, MODEL, SM: NOT AVAILABLE, PRIMARY COAL CRUSHER, <br /> DESIGNED RATED AT 1,800 TONS PER 130UR. <br /> QUANTITY OF COAL PROCESSED: 10,000,000 TONS PER YEAR. <br /> OVERALL COMROL EFFICIENCY <br /> EMISSIONS OF PARTICULATE MATTER CONTROLLED BY ONE (1) MAKE, FOR TSP AND PM,° IS A MAIMUM <br /> MODEL, SM: NOT AVAILABLE, BAGHOUSE. OF 95.0 %. <br />114 SAMPLINC.CONVEYTNG.TRANSFER POINT: <br /> RUN-0F-MINE COAL SWEEP SAMPLER <br /> NUMBER OF TRANSFER POINTS: I <br /> OVERALL CONTROL EFFICIENCY <br /> QUANTITY OF COAL SAMPLED: 10,000,000 TONS PER YEAR FOR TSP AND PM~o IS A MNIMUM <br /> QUANTITY OF SAMPLE COLLECTED: 65,000 TONS PER YEASL OF 95.0 %. <br /> EMISSIONS OF PARTICULATE MATTER CONTROLLED BY ONE (I) MAKE, <br /> MODEL, AND SM: NOT AVAILABLE, BAGHOUSE. <br />115 SECONDARY CRUSHER HOUSE: <br /> ONE (I) MAKE, MODE4 AND SM: NOT AVAILABLE, SECONDARY COAL <br /> CRUSHER, DESIGN RATED AT 2,000 TONS PER HOUR. <br /> QUANTr1Y OF COAL PROCESSED: 10,000,000 TONS PER YEAR <br /> OVERALL CONTROL EFFICIENCY <br /> EMISSIONS OF PARTICULATE MATTER CONTROLLED BY ONE (I) MAKE, FOR TSP AND PM~o IS A MINIMUM <br /> MODEL, AND SM: NOT AVAILABLE, 6AGHOUSE. OF 95.0 %. <br />ATTACHMENT A CONTINUED ..... <br />107/0009/999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.