|
Page 4 Colorado Department of Public Health and Environment
<br />Construction Permit Air Pollution Control Division
<br />TWENTYMILE COAL COMPANY
<br />Permit No. 93R01204
<br />Initial Approval -Modification-S
<br />ATTACHMENT A
<br />DETAILS OF EQUIPMENT /ACTIVITIES COVERED UNDER THIS FACILITY-WIDE PERMIT
<br /> DESCRIPT1oN
<br />AIRS MAKE, MODEL, SM, DESIGN RATE, CAPACITY, DIMENSIONS, REMARKS
<br />ID OPERATION RATE,CONSUMPTION,THROUGHPU7,PRODUCTION, SPECIFIC PROVISIONS
<br /> EMISSION CONTROLS
<br />101 MINE VENTILATION FANS:
<br /> ONE (I) MAKE, MODEL, AND SM: NOT AVAILABLE, MINE VENTILATION FAN, MAXIMUM CONCENTRATION OF
<br /> DESIGN RATED AT 600,000 ACFM, AND POWERED BY AN ELECTRIC MOTOR PARTICULATE MATTER M THE
<br /> RATED AT 1,250 HP.. THIS FAN IS IDENTIFIED AS MME VENTILATION FAN MME AIR EXHAUSTED INTO THE
<br /> Na. I, AND IS LOCATED ON MME SHAFF No. 1. ATMOSPHERE DOES NOT EXCEED
<br /> 0.5 MILLIGRAM PER CUBIC METER.
<br /> ONE (I) MAKE, MODEL, AND SM: NOT AVAILABLE, MME VENTILATION FAN,
<br /> DESIGN RATED AT 30,000 ACFM, AND POWERED BY AN ELECTRIC MOl'OR,
<br /> RATED AT 400 HP.. TH15 FAN IS IDENFIFIED AS MME VENTILATION FAN No.
<br /> 2, AND IS LOCATED ON MME SHAFT No. 2.
<br /> ONE (I) MAKE, MODEL, AND SM: NOT AVAILABLE, MME VENrI'ILATION FAN,
<br /> DESIGN RATED AT 600,000 ACFM, AND POWERED BY AN ELECTRIC MOTOR,
<br /> RATED AT 1,000 NP.. THIS FAN IS IDENTIFIED AS MME VENTILATION FAN
<br /> Na. 3, AND IS LOCATED ON MME SHAFT No. 3.
<br /> ONE (1) MAKE, MODEL, AND SM: NOT AVAILABLE, MME VENTILATION FAN,
<br /> DESIGN RATED AT 150,000 ACFM, AND POWERED BY AN ELECTRIC MOTOR
<br /> RATED AT 1,300 HP.. THIS FAN IS IDEMIFIED AS MME VENTILATION FAN
<br /> No. 4, AND IS LOCATED ON MME SHAFT No. 4.
<br /> AIL THE FOUR (4) FANS RUN CONTMUOUSLY, 6,760 HOURS PER YEAR.
<br />102 TRANSFERS FROM SLOPE BELT TO STACKER TUBE FEED BELT:
<br /> TRANSFER OF WASTE ROCK
<br /> TRANSFER OF COAL
<br /> TOTAL QUANTITY TRANSFERRED: 11,000,000 TONS PER YEAR
<br /> OVERALL CONTROL EFFICIENCY
<br /> EMISSIONS OF PARTICULATE MATTER CONTROLLED BY ENCLOSNG THE FOR TSP AND PM~o IS A MMIMUM
<br /> TRANSFER POMTS. ~ OF H0.0
<br />103 TRANSFER FROM STACKER TUBE BELT TO STACKER TUBE:
<br /> TRANSFER OF COAL
<br /> QUANTrrY OF COAL TRANSFERRED: 10.000,000 TONS PER YEAR.
<br /> OVERALL CONTROL EFFICIENCY
<br /> EMISSIONS OF PARTICULATE MATTER CONTROLLED BY ENCLOSNG THE FOR TSP AND PM ,u lS A MMIMUM
<br /> TRANSFER POINTS. OF 90%.
<br />404 TRANSFER FROM STACKER TUBE TO STOCKPILE:
<br /> TRANSFER OF COAL
<br /> QUAMffY OF COAL TRANSFERRED: 10,000,000 TONS PER YEAR.
<br /> OVERALL CONTROL EFFICIENCY
<br /> EMISSIONS OF PARTICUTAT£ MATTER CONTROLLED BY ENCLOSING THE FOR TSP AND PM~o IS A M}NSMUM
<br /> TRANSFER PONTS. OF 90%.
<br />ATTACHMENT A CONTINUED .....
<br />107!0009/999
<br />
|