Laserfiche WebLink
COLORADO <br />llF;PAR7'ME~T <br />()F~HEALTH <br />"1 <br />April 18, 1991 <br />1 <br />POD ~ Mr. Nilliam A. Bear, Jr. <br />Jora.KOro+ Somerset Mining Company <br />IrvimFau,.nsn~,eev P.O. Box 535 <br />Somerset, Colorado 81434 <br />GnnO Jepbe RgioW OR,a <br />u:s.emsu~aor„xsJ RE: Fugitive Particulate Control Flan <br />or.va Jaemm.cdr.m usm.nes <br />T,,,,r,,,,~ Tl~e Fugitive Particulate Control Plan dated March 2i, 1991, <br />pmlJaa,w submitted to t}iis office by N. Gale Biggs Associates has been <br />reviewed. It }gas been determined that tl,e plan, as submitted <br />should adequately control air pollution emissions with one <br />addition as follows: <br />"Mud, dirt and coal deposited on state <br />}~ighway 133 and/or other paved portions of <br />tl~e truck }caul route shall be removed by <br />sweeping, washing with water or a <br />combination. A daily inspection of the haul <br />route shall be conducted with cleanup <br />conducted as necessary to minimize dust." <br />If the addition of this section to the <br />acceptable, please submit an alternate <br />source. If I do not hear from you wit <br />this letter I will assume the addition <br />You may t}ien consider t}~e Control Plan <br />this letter! <br />Sincerely, <br />Scott J. Miller <br />Air Pollution Control Division <br />Control Plan is not <br />plan for controlling this <br />nin 10 days of the date of <br />meets with your approval. <br />approved and amended by <br />SJM/sh <br />cc: Karl Mount - Mine Land Reclamation/with Control Plan <br />N. Gale Biggs <br />Andy Moschner/with Control Plan <br />Denver APC Office <br />'. <br />©v ,~.d~,..~arrsr <br />