III. Environmental Information <br />1. The archaeological study referred to on page 3-12 should be included in <br />an appendix. <br />2. The proposed monitoring plan on page 3-74 should be revised to reflect <br />Stipulation No. 3 and any revision to the plan. <br />IV. Operation a and Reclamation Plan <br />1. On page 4-2, reference is made to a hydraulic mining test conducted in <br />1981. New Castle should discuss how this activity was permitted and <br />the status of reclamation and bonding for the project. <br />2. Throughout Section 4 the proposed refuse disposal area is discussed. <br />As this facility has not been approved, it may be appropriate for NCEC <br />to delete all references to the proposed pile. More importantly, NCEC <br />will need to obtain the Division's opinion that it will be difficult to <br />repermit this operation (initially) without approval for the refuse <br />area, in so far as the mine cannot successfully operate without such <br />approval. In addition, the refuse area is needed as a disposal site <br />for rail spur ballast. Therefore, the loadout cannot be built until <br />the refuse area is approved or an alternate plan fordisposal of rail <br />spur ballast is approved. <br />3, The cut and fill volumes presented in Table 4.1-3 and TR-O1 indicate an <br />excess of materials, based on a 1.3 swell factor, NCEC should address <br />the actual excess produced during construction to confirm this swell <br />factor. In addition, the Division was unable to verify the cut and <br />fill volumes presented. Figure TR-8, which shows cross cut, and does <br />not agree with the total volumes included in the permit. This <br />situation must be corrected so that accurate volume estimates are <br />included in the permit. <br />4. In several areas of the permit, a diversion ditch above the portals is <br />mentioned. These references should be deleted as per TR-O1, Pages on <br />which the diversion is mentioned include 4-26, 4-57 and 4-83. <br />Calculations for the ditch should be removed from Appendix 4.2-3. <br />5. The narrative on page 4-44 should be revised to indicate the current <br />position of the facilities with respect to the Vulcan Ditch, as per <br />TR-O1, <br />6. The topsoil salvage section on pages 4-62 and 4-67 should be amended to <br />show the actual location of topsoil stockpiles and the stockpile <br />volumes. In addition, NCEC should discuss how the large number of <br />boulders encountered during topsoil salvage has affected to total <br />salvage volume and the topsoil reapplication plan. <br />7. The revegetation success criteria on page 4-71 should be revised to <br />reflect the permit stipulation commitments. <br />8. As previously stated, references to the refuse disposal area should be <br />deleted until a plan is approved by the Division. One area which will <br />need to be revised with respect to the refuse plan is the revegetation <br />