<br /> <br />4 <br />deficiencies in application which must be remedied prior to commencement of <br />technical review. <br />4 !an. '95 Letter from MLRD to COM, lnc. acknowledging receipt of a "complete" permit <br />application, but requiring completion of approx. 3 1 /2 pages of "adequacy items"; <br />decision date by Division of Minerals and Geology of January 18, 1995. <br />11 Jan. '95 Certificate of Analysis of water samples taken 28 December 1994 from three <br />down-I,~radient wells, plus the Hazel A adit. R. Mason participated in sampling <br />and retained control of samples thru the delivery to shipper. <br />25 Jan. '95 Notice of Violation and Board Order 1/M-95-001 for failure to obtain a new <br />permit on the Gold Hill Millsite by December 1, 1994 as required by Board <br />Order iYM-94-042; cease & desist on use of the mill and tailings <br />impoundment pending a properly engineered plan solving tack of freeboard in <br />the impoundment, instability of tailings deposited in the impoundment and spillage <br />of tailings in the mill building. <br />30 Jan. '95 MLRD Letter formally notifying COM, Inc. of Board action; requires an <br />approved permit on the site by February 28, 1995, on penalty of permit <br />revocation and bond forfeiture (543,277); pay $5,000 civil penalty with $4,500 <br />suspended upon completion of required corree:tive actions by February 28, 1995. <br />6 Feb. '95 Letter from Mr. Bill York-Feirn of MLRD furnishing partial transcript of board <br />hearing of 1anuary 25, 1995; remarks by Board members severely critical of <br />COM, Inc_ operation of the Gold Hill Mill. <br />20 Feb. '95 The COME submitted a five-page written Statement of Comments and Objections <br />to the Division of Minerals and Geology, consisting of an abbreviated review of <br />the application of COM, Inc. for a limited impact permit for the Gold Hill Mill. <br />It included a statement as to the possible illegality of permitting the mill as a <br />stand-alone operation in a Forestry Zone. <br />27 Mar. '95 Division of Minerals and Geology (Allen C. Sorenson) letter to Mr. Thames <br />Hartley of COM, Inc. stating the results of the DMG's second review of COM, <br />Ines permit application, including supplementary information submitted by COM, <br />Inc., and "... third party written comments....", presumably including those of <br />COME. This letter, which runs to eleven pages, includes an extended discussion <br />of relevant engineering and bonding issues, including instrumentation and on-site <br />verification and quality assurance. Many of these were raised in the COME letter <br />noted above. COM, Inc. has until May 1, 1995 to respond to the letter. <br />"Response' includes establishment of adequate freeboard in the tailings <br />impoundment. <br />