My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL37427
DRMS
>
Back File Migration
>
General Documents
>
GENERAL37427
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:33 PM
Creation date
11/23/2007 9:10:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
7/25/1983
Doc Name
RESULTS OF OBSERVATION AND TESTING OF FILL COMPACTION
From
LAMBERT & ASSOCIATES
To
WEST ELK COAL CO
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. M83007MT • • <br />West Elk Coal Company <br />July 25, 1983 <br />Paqe Two <br />Site Conditions <br />The fill was placed on a near horizontal surface bounded by <br />a steep slope to the south. The natural elope was as steep as <br />about 1/2:1, horizontal to vertical. <br />The project site supported a volunteer growth of weeds and <br />grass in the area formally used as a mine portal. <br />Fill Placement and Compaction <br />The fill material (coal gob) was placed in layers at near <br />optimum moisture content required for compaction and compacted <br />to at least 95 percent relative compaction as determined by <br />AST6t D-696 and D-1556. Compaction was obtained using a rubber <br />fire loader with segmented sheepsfoot overlays on the rubber <br />tires. Spreading of the material was by a catapillar D-8 dozer. <br />The contractor placing and compacting the fill was Beavers <br />Amt <br />Construction under the direction of Mr. fd Beavers. Our work <br />wa<: coor~ainated by Mr. Dennis Conn, West Elk Coal Company. <br />Summary <br />The observation and testing of the fill placement described <br />in this report was performed by our engineering technician, Mr. <br />Greg Harris. <br />If you have any further questions please contact <br />fully~s fitted, <br />~ s .. OC 7,A"-.,g S <br />:o ? V <br />_~, e 131E8 ~, _` <br />~r`\ nnis D. Lambert, P.E. <br />DDL/dkw y0,',•._ _•~ Project Geotechnical Engineer <br />~Cambert ana ~.ggociares~ <br />CONSULTING OEOTECN LAICAL ENGINEERS AMO <br />MATERIAL TESTING <br />
The URL can be used to link to this page
Your browser does not support the video tag.