Laserfiche WebLink
the mine as areas cease to be used for mining activities. During reclamation, the mine portals <br />will be sealed, surface facilities removed, and the entire disturbed area will be returned to <br />approximate original contour. The waste pile will be shaped to blend into adjacent topography. <br />The mine azea will then be smooth graded, and compacted azeas will be ripped or scazified to <br />eliminate slippage surfaces, establishing a suitable bond for the overlying seedbed material. <br />Topsoil, which has been salvaged during construction of the surface facilities, will be <br />redistributed over the disturbed area. Drainage control will be retained until the revegetation <br />operation is underway and erosion is under control. Following the distribution of topsoil and <br />final grading, the newly shaped surface will be prepazed for planting. Surface preparation will <br />loosen and roughen the surface by disking, harrowing, or dragging. Various conditioners and <br />neutralizers may be used to modify the seedbed conditions to ensure successful establishment of <br />a vegetative cover. The site will then be planted using West Elk's Permanent and Riparian <br />Seeding mix. Vazious species of shrubs will also be planted. <br />38 <br />