My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-06-02_GENERAL DOCUMENTS - C1980007
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2006-06-02_GENERAL DOCUMENTS - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 6:42:21 AM
Creation date
11/23/2007 9:08:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
6/2/2006
Doc Name
Proposed Decision & Findings of Compliance for PR10
From
E-Seam Longwall Mining & Development of South of Divide Area
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by way of slopes and a ventilation shaft from inside the existing F Seam workings to the B Seam. <br />The revision also included mining in the B Seam by room and pillar, as well as longwall mining <br />methods. The 35.5-acre incidental boundary change was necessary to accommodate the B Seam <br />main access entries. The Division subsequently issued a proposed decision to approve the <br />revision on July 12, 1989. <br />In 1990, the West Elk Mine began prepazations to produce coal from the B Seam. Initially, <br />room-and-pillar mining using a continuous miner was utilized to develop panels in the B Seam, <br />for later removal using longwall methods. Mining in the F Seam has been discontinued, until <br />market conditions improve so that this seam can be economically mined. <br />Elevated levels of indicator gases showed there was probable combustion in gob in a mined-out <br />area of the B-West mains in January 2000. Operations were curtailed and MCC immediately <br />began an operation to access the B-seam by drilling into the mine from the Apache Rocks area <br />above. Permission was obtained from both CDMG and the US Forest Service to initiate a <br />drilling program in that area. Nineteen 4-inch drillholes were emplaced, the location of the <br />combustion identified, and water subsequently pumped into the area from the drillholes in the <br />Apache Rocks area. In the spring of 2001, MSHA gave MCC permission to curtail the pumping <br />of water, so the company completely sealed off the area underground and initiated the approved <br />reclamation of the disturbed ground on the surface. <br />No major buildings, major structures, occupied dwellings, cemeteries, parks, railroads or <br />highways overlie the coal to be mined. Two reservoirs lie close to the F Seam outcrop; however, <br />neither is directly over the coal to be mined. <br />Ventilation in the mine is provided by a fan in Sylvester Gulch. Power to the mine is supplied <br />via existing lines of the Delta-Montrose Electric Association. At a substation located in the main <br />mine facilities azea power is stepped down to serve the underground mine and to serve the <br />surface facilities. With Permit Revision No. 7, MCC constructed an air intake shaft and an <br />exhaust shaft within Sylvester Gulch. <br />Mountain Coal Company submitted a technical revision (#93) to seal the bulkheads at the Lone <br />Pine fan portal. Mining ceased in the Lone Pine portion of the mine in early 2001 and the <br />workings served by the fan portal were sealed off underground. The longwall was moved in <br />2001 to the Eastern mining district East of Sylvester Gulch and mining has since progressed <br />southward in the permit area. <br />Explosives at the mine aze only occasionally used for underground construction purposes. Very <br />little explosives are required for this purpose. West Elk does have an explosives magazine <br />located on site. <br />The West Elk Mine portals are situated at an approximate elevation of 6,450 feet. Run-of--mine <br />coal is transported from the production panels to the various surface facilities by a system of belt <br />conveyors. A conveyor carries coal from inside the mine portal to the stacking tubes. From the <br />stacking tubes, an underground conveyor reclaim system will transport the coal to the two <br />crushers. A conveyor then moves the coal from the crushers to the two storage silos. A <br />stacktube located to the east of the silos provides additional storage for product coal. A loadout <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.