Laserfiche WebLink
Stipulation No. $1 <br />THE DIVISION 4 WATER COURT SHALL BE NOTIFIED OF THE NEW POND LOCATIONS WITHIN 4$ <br />DAYS OF DMG'S PROPOSED DECISION. IN ADDITION, A DAM SAFETY REVIEW SHALL BE <br />COMPLETED ON MB-2 AND MB-3 WITHIN 4$ DAYS AFTER CONSTRUCTION OF THE PONDS IS <br />COMPLETED. (COMMENTS RECEIVED FROM THE DIVISION OF WATER RESOURCES DATED <br />SEPTEMBER 17, 1993.) <br />STATUS: COMPLIED WITH 4/3/199$. <br />Stipulation No. $2 <br />SUBMIT TYPICAL CROSS-SECTIONS, DETAILS OF DISTURBANCE THAT WILL OCCUR, AND <br />RECLAMATION WORK TO BE COMPLETED FOR THE EXPLORATION ROAD THAT WILL BE <br />CONSTRUCTED IN LONE PINE GULCH. <br />STATUS: COMPLIED WITH 4/12/1994. <br />Stipulation No. $3 <br />ALL UNRESOLVED PERFORMANCE STANDARD ISSUES AND SUBMITTAL REQUIREMENTS SUCH <br />AS, BUT NOT LIMITED TO, GEOTECHNICAL STABILITY ISSUES, SEDIMENT CONTROL PLANS, <br />BONDING REQUIREMENTS, AND REVISED PAGE, MAP AND/OR EXHIBIT HARD COPY <br />SUBMITTALS, SHALL BE SUBMITTED AND APPROVED BY THE APPROPRIATE REVISION <br />PROCESS PRIOR TO PROJECT INITIATION. <br />STATUS: COMPLIED WITH 8/22/1994. <br />Stipulation No. $4 <br />FOR THE REFUSE PILE EXPANSION, MCC OR ITS CONSULTANTS SHOULD EITHER (1~ PREPARE <br />A MORE DESCRIPTIVE JUSTIFICATION FOR THE SELECTION OF THE MECHANICAL PROPERTIES <br />USED IN COMPLETING THE ANALYSIS OR (2) PERFORMA A SENSITIVITY ANALYSIS OF THE PILE <br />USING THE SELECTION OF COAL REFUSE STRENGTH VALUES CONTAINED IN THE EARLIER <br />LOWER REFUSE PILE STABILITY ANALYSIS. THIS INFORMATION SHOULD BE SUBMITTED ON <br />OR BEFORE FEBRUARY 17, 199$. THE DISPOSAL OF THE COAL WASTE SHOULD NOT BEGIN <br />UNTIL THE INFORMATION REQUIRED HAS BEEN REVIEWED BY THE DIVISION. <br />STATUS: COMPLIED WITH 2/16/199$. <br />Stipulation No. $$ <br />MCC MUST SUBMIT ADDITIONAL INFORMATION REGARDING REPAIN PLAN FOR THE HAUL <br />ROAD. A PLAN VIEW OF THE SURFACE WATER DRAINAGE, CROSS SECTION OF BUTTRESS <br />16 <br />