My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL37230
DRMS
>
Back File Migration
>
General Documents
>
GENERAL37230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:26 PM
Creation date
11/23/2007 9:02:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
9/21/1993
Doc Name
REPORT LANDSLIDE INVESTIGATION REPORT JUMBO MOUNTAIN SOMERSET COLO FOR ARCO COAL CO PROJECT # 2272-0
Permit Index Doc Type
PUBLIC CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I • The remaining mass of old landslide deposiu is stable under current conditions. <br />• Smaller scale active landslide movements are occurring on steeper parts of the old <br />1 landslide mass. These movemenu aze relatively slow. <br />• I-ongwall mining beneath the Jumbo Mountain landslide is highly unlikely to cause <br />the resumption of deep-seated movement of the old landslide mass. <br />• Mining is also unlikely to increase the incidence or rate of movement of the smaller <br />scale active landslides. These movements are likely to continue with or without <br />mining, particularly during spring snowmelt. <br />_ • Subsidence will lead to surface craclarg which mzy be difficult to distinguish from <br />I cracking due to landslide movement. <br />• Neither the large ancient landslide movements or the current small-scale movements <br />J Krill potentially affect the successful development of a longwall mining panel as <br />currently proposed. <br />1 If mining proceeds, it is recommended that inclinometers be installed in two borings to the north <br />of the northern limit of mining. These should not be positioned in areas of current instability. <br />l They should terminate below the 'B' seam. It is also recommended that two piezometers be <br />installed to the north of the proposed mine at the inclinometer locations and two piezometers <br />1 should be installed to the south of the mine. These instruments should be sited once the location <br />of the mine has been confirmed. <br />-14- <br />0: \Off\30\JPiVIRLO•Rpt.lkl <br />I .• <br />
The URL can be used to link to this page
Your browser does not support the video tag.