Laserfiche WebLink
i i <br />• <br />• <br />GEC EAST PIT RECLAMATION SCHEDULE <br />DESCRIPTION START FINISH TOTAL DAYS <br />MOBILIZATION 2/14 2/18 4 <br />CHEWS HILL REDUCTION 3/21 5/16 56 <br />CHEWS HILL DITCH 4/4 4/30 26 <br />CHEWS HILL TOPSOIL 4/11 5/16 35 <br />WEST SLOPS 2/14 2/25 11 <br />WEST SLOPE TOPSOIL 2/18 2/28 10 <br />NORTH END BACKFILL Z/21 5/10 78 <br />NORTH END TOPSOIL REPLACEMENT 3/1 5/16 76 <br />EAST PIT BACKFILL W TO E 2/14 5/10 85 <br />EAST PIT SLOPE RED. E TO W 2/14 4/30 75 <br />EAST PIT CHANNEL 3/14 5/16 ~74T63 <br />EAST PIT TOPSOIL REPLACEMENT 2/14 5/10 85 <br />REVEGETAION 3/21 5/16 56 <br />DEMOBILIZATION 5/9 5/16 7 <br />