My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL37111
DRMS
>
Back File Migration
>
General Documents
>
GENERAL37111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:22 PM
Creation date
11/23/2007 9:00:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
General Documents
Doc Date
7/14/1987
Doc Name
CASH MINE FN M-83-141
From
GOLD HILL VENTURES
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-`~~~~ III llllllllllllllll• <br />• 999 <br />~~ECENEr' (TOLD H[LL VENTURES <br />~ P.O. Box 1521 <br />JUN 0 2 1995 Longmont, Colorado 80502 <br />449-7748 (Mlllsite) ~^`,~~ <br />Division of M~nerars a Geology 851-2985 (Office) ~~~ `v <br />auly ls, 1987 y~L 17 t98T <br />M1NE~ U`ND <br />RECIAMAYION f)1VISlON <br />Mr. Edward L. Bischoff <br />Minerals Supervisor <br />Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />RE: CASH MINE, Flle M-83-141 <br />Dear Mr. Bischoff: <br />This letter is being submitted to the Mined Land Reclamation <br />Division in accordance with the Amendment Conditions attached to the <br />~, Cash Mine Llmlted Impact permit approved on September 28, 1985, by <br />the Mined Land Reclamat[on Board. <br />1. The initial tailings impoundment storage area occupies a rectan- <br />gular shaped Brea that has the dimensions of 275 feet by 100 feet at its <br />longest and widest points. The toe of the tailings dam extends for 330 <br />feet along its outer face from the northeastern edge to the southwestern <br />edge of the structure. A revised Millslte and Tailings Pond Reclamation <br />Plan ;Nap that reflects these changes will be submitted to the Mined <br />Land Reclamation Division. <br />Following the completion of the fallings dam construction earth <br />work, the following sequence of geomemDrane liner installation was <br />followed: <br />1. All sharp rocks, large stones, roots, vegetation, and other <br />foreign material were removed from the Interior of the fallings <br />impoundment erea. <br />2. All of the remaining surface irregularities were smoothed <br />out and a layer of compacted decomposed granite was placed on <br />the bottom and sides of the tailings retention structure. <br />3. An anchor trench 24 inches wide by 38 inches deep was dug <br />with a backhoe around the inner perimeter o[ the tailings dam to <br />hold the edge of the geomembrane liner. This trench was dug a <br />~- minimum of at least 1 foot from the interior slope of the tailings <br />impounding erea. <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.