Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ <br />~ <br />~ <br />~ <br />~ Task Description ~ Cost <br />~ <br />~ <br />~ <br />~ (S) <br />Subtotal (X ): <br />1. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (S) <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />Subtotal (1 ): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description <br />5 <br />Replace 8" topsoil over 35 acres; 37,284 cy <br />(37,284 CCY x 50.50/[CY) <br />Cost (f) <br />518,642 <br />Subtotal (J): f18, 642 <br />