Laserfiche WebLink
<br />-6- <br />RIDER TO MINING PERMIT <br />~~ <br />Permit Date July 5 1985 Permit No. C-004-80 <br />The following additional stipulations and conditions form an integral part of <br />the foregoing permit: <br />IF, DURING THE COURSE OF OPERATIONS, PREVIOUSLY UNIDENTIFIED CULTURAL <br />RESOURCES ARE DISCOVERED, THE APPLICANT SHALL INSURE THAT THE SITE IS <br />NOT DISTURBED AND SHALL NOTIFY THE REGULATORY AUTHORITY. THE APPLICANT <br />SHALL INSURE THAT THE RESOURCE(S) IS PROPERLY EVALUATED IN TERMS OF THE <br />NATIONAL REGISTER OF HISTORIC PLACES ELIGIBILITY CRITERIA (36 CFR <br />60.6). SHOULD A RESOURCE BE DETERMINED ELIGIBLE FOR LISTING IN <br />CONSULTATION WITH THE REGULATORY AUTHORITY AND THE SHPO, THE APPLICANT <br />SHALL CONFER WITH AND OBTAIN THE APPROVAL OF THE REGULATORY AUTHORITY <br />AND THE SHPO CONCERNING THE DEVELOPMENT AND IMPLEMENTATION OF <br />MITIGATION MEASURES AS APPROPRIATE. IF PREVIOUSLY UNPLANNED SURFACE <br />DISTURBING ACTIVITIES ARE NECESSARY, THE APPLICANT SHALL SUBMIT A <br />JUSTIFICATION AND MAPS SHOWING THE PROPOSED DISTURBANCE TO THE <br />REGULATORY AUTHORITY FOR APPROVAL PRIOR TO THE COMMENCEMENT OF THESE <br />ACTIVITIES. <br />2. SURFACE WATER MONITORING: <br />A. FLOW MEASUREMENTS MUST BE TAKEN AT SURFACE WATER MONITORING SITE <br />SW-2 AND WATER SAMPLES SHALL BE TAKEN FROM SITES SW-2 AND SW-5 ON <br />McCLANE CANYON TWICE A YEAR (AT DIFFERENT TIMES OF THE YEAR) AS FOLLOWS: <br />i) ONCE DURING SPRING SNOWMELT <br />ii) ONCE DURING A STORM EVENT <br />8. FLOW MEASUREMENTS MUST BE TAKEN QUARTERLY FROM SITE SW-1 AND WATER <br />SAMPLES MUST BE TAKEN QUARTERLY FROM SITES SW-1 AND SW-8. <br />C. THE WATER SAMPLES MUST BE CHEMICALLY ANALYZED FOR THE <br />PARAMETERS SPECIFIED BELOW: <br />pH Sodium Absorption Sodium (Na+) Lead(Pb) <br />Specific Conductance Ratio Sulfate(S04) Manganese(Mn) <br />Temperature(field) Bicarbonate(HC03) Aluminum(Al) Mercury(Hg) <br />Total Suspended Solids Calcium(Ca+2) Arsenic(As) Molybdenum(Mo) <br />Total Dissolved Solids Magnesium(Mg+2) Boron(B) Selenium(Se) <br />Total Combustible Solids Cadmium(Cd) Zinc(Zn) <br />Total Hardness Copper(Cu) <br /> Iron(Fe) <br />D) THE RESULTS OF A LL MONITORING MUST BE SUBMITTED TO THE <br />DIVISION IMMEDIATELY AFTER DATA COLLECTION AND ANALYSIS. <br />E) DUE TO THE CURRENT TEMPORARY CESSATION OF OPERATIONS AT THE <br />McCLANE CANYON hIINE, ITEMS A, B, AND C LISTED ABOVE ARE MODIFIED AS <br />FOLLOWS: QUARTERLY FLOW MEASUREMENTS SHALL BE TAKEN ONLY AT <br />SURFACE WATER MONITORING SITE SW-2. WATER QUALITY SAMPLES SHALL BE <br />TAKEN TWICE A YEAR (ONCE DURING SPRING SNOWMELT AND ONCE DURING A <br />STORM EVENT) AND MUST BE CHEMICALLY ANALYZED FOR THE PARAMETERS <br />LISTED BELOW: <br />