My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL36992
DRMS
>
Back File Migration
>
General Documents
>
GENERAL36992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:18 PM
Creation date
11/23/2007 8:57:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
1/12/1998
Doc Name
HAUL ROAD Along Old Railroad Bed CERTIFICATION
From
J E STOVER & ASSOCIATES
To
DMG
Permit Index Doc Type
ROADS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOWIE RESOURCES LIMITED <br />Bowie No. 2 Mine <br />Haul Road Along Old Railroad Bed Certification <br />This haul road segment begins at approximately station 5+00 on the haul road to the <br />portal bench and traverses along the old railroad bed that was used by the old King <br />Mine loadout. The haul road segment is approximately 2600-feet long and provides <br />access to the bottom (southern boundary) of the gob pile and to sediment ponds C and <br />D. The first 12000-feet of the haul road is subject to this certification (= station 100+00 <br />to station 120+00). Refer to Map No. 16, Haul Road Plan & Profile, Gobpile. <br />In accordance with Rule 4.03.1 (1)(d)(i), this certification has been prepared to certify <br />the haul road along the old railroad bed has been constructed as designed and in <br />accordance with the approved plan. <br />Since this haul road traverses the old railroad grade, the road embankment was not <br />actually constructed or reconstructed. The stability of the haul road should not be a <br />concern since the roadbed functioned as a railroad subgrade for many years up <br />through the mid 1970's. There are no springs or water seeps along the roadbed that <br />might compromise the stability of the haul road. <br />The permitted configuration of the haul road is a 20-foot wide roadway with an earth <br />and rock safety berm on the outside slope and a drainage ditch on the inside. Over six <br />inches of gravel surfacing was placed and compacted on the haul road segment during <br />the first full week of January 1998. <br />To the best of my knowledge and belief, the haul road alon~.t~e old railroad bed was <br />constructed as designed and in accordance with the ~~~r.,~ved ~p~~~~a <br />~~ `'` ^~o <br />~~ ~<,- - ; <br />Jarlie~ E. Stover ,= «o <br />P.E;"~lo. 19230 woo <br />~rf .. •...,.. •'~C~ i~ <br />~~''%or,at' E;P° <br />~ p P ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.